Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Kansas City Area Transportation Authority
Provide bus stop amenities. This scope of services/specifications includes design, engineering, manufacture and installation of modular components. In addition, installation of the structures themselves at designated locations along city regional bus routes. Each shelter shall be equipped with a bench seat. The bench will be 6'-0" with 2 anti-vagrant bars.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Mesa County
Provide Mesa County with bus stop amenities through the awarding of, one or more, multi-year Blanket Purchase Agreement(s) (BPA) β a simplified method of filling anticipated repetitive needs.
Posted Date
Oct 20, 2025
Due Date
Nov 18, 2025
Release: Oct 20, 2025
Mesa County
Close: Nov 18, 2025
Provide Mesa County with bus stop amenities through the awarding of, one or more, multi-year Blanket Purchase Agreement(s) (BPA) β a simplified method of filling anticipated repetitive needs.
Dallas Area Rapid Transit
Provide 300 12' x 6' NextGen shelter 3 bay (slim4) (50191); 400 10' x 6' NextGen shelter 2-1/2 bay (slim3) (541265); 450 8' x 6' NextGen shelter 2 bay (wide 4) (54080). Also includes fabrication, delivery, installation and disposal of bus shelters, benches, lighting and associated technology throughout DART's 700 square mile service area.
Posted Date
Aug 27, 2025
Due Date
Nov 20, 2025
Release: Aug 27, 2025
Dallas Area Rapid Transit
Close: Nov 20, 2025
Provide 300 12' x 6' NextGen shelter 3 bay (slim4) (50191); 400 10' x 6' NextGen shelter 2-1/2 bay (slim3) (541265); 450 8' x 6' NextGen shelter 2 bay (wide 4) (54080). Also includes fabrication, delivery, installation and disposal of bus shelters, benches, lighting and associated technology throughout DART's 700 square mile service area.
AvailableCity of Mesa
Provide bus stop/shelter and street amenity maintenance and repair services.
Posted Date
Nov 4, 2025
Due Date
Dec 4, 2025
Release: Nov 4, 2025
City of Mesa
Close: Dec 4, 2025
Provide bus stop/shelter and street amenity maintenance and repair services.
AvailableTown of Chapel Hill
The focus of this project includes bus stop and site amenity improvements to existing stop locations at various locations with the Town of Chapel Hill limits. This work will generally consist of clearing, grading, concrete pads and sidewalks, installing amenities, traffic control, and other related items.
Posted Date
Nov 6, 2025
Due Date
Dec 4, 2025
Release: Nov 6, 2025
Town of Chapel Hill
Close: Dec 4, 2025
The focus of this project includes bus stop and site amenity improvements to existing stop locations at various locations with the Town of Chapel Hill limits. This work will generally consist of clearing, grading, concrete pads and sidewalks, installing amenities, traffic control, and other related items.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis