Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The scope of work includes the replacement of the existing fine screens and aerated grit removal system, the replacement of the existing 0.5 MGD contact stabilization treatment system with 0.5 MGD extended air process with a new detached chlorine contact basin, the replacement of the existing gaseous chlorine and sulfur dioxide systems with liquid sodium hypochlorite and sodium bisulfite feed systems, and the rehabilitation of the existing 0.5 MGD concrete structure and conversion to an equalization basin and aerobic digestor.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Rehabilitation of the secondary clarifiers at the wastewater treatment plant. The project includes structural, process, and electrical rehabilitation of the lower plant secondary clarifiers no. 27 and no. 37 to improve operational reliability and performance.
Posted Date
-
Due Date
Jan 15, 2026
Close: Jan 15, 2026
Rehabilitation of the secondary clarifiers at the wastewater treatment plant. The project includes structural, process, and electrical rehabilitation of the lower plant secondary clarifiers no. 27 and no. 37 to improve operational reliability and performance.
AvailableScope of project: wastewater treatment plant rehabilitation including cleaning, blasting and recoating of existing on-site lift station wet well, piping, valves, and all appurtenances; bypass pumping; repair of cracks on walls of aeration basins, digester basins, clarifiers and chlorine contact basins, replacement of various valves at basins and piping; installation on site bathroom and appurtenances, rehabilitation of influent manhole and off site lift station rehabilitation including cleaning, blasting and recoating of existing lift station wet well, piping, valves, manhole and electrical improvements.
Posted Date
-
Due Date
Jan 21, 2026
Close: Jan 21, 2026
Scope of project: wastewater treatment plant rehabilitation including cleaning, blasting and recoating of existing on-site lift station wet well, piping, valves, and all appurtenances; bypass pumping; repair of cracks on walls of aeration basins, digester basins, clarifiers and chlorine contact basins, replacement of various valves at basins and piping; installation on site bathroom and appurtenances, rehabilitation of influent manhole and off site lift station rehabilitation including cleaning, blasting and recoating of existing lift station wet well, piping, valves, manhole and electrical improvements.
This solicitation requests all supervision, labor, materials, equipment, and services to rehabilitate the Village of Wilson’s wastewater treatment plant (oxidation pond) and three sewer pump stations. The project is funded through the Louisiana Department of Environmental Quality State Revolving Fund (LDEQ SRF Loan #CS221965-01) and requires a bid guarantee equal to at least 5% of the total bid. Bids are due by 10:00 AM on January 15, 2026 (submit electronically via Central Bidding or hand-deliver to Village of Wilson Town Hall), with a pre-bid conference on January 8, 2026 at 10:00 AM.
Posted Date
-
Due Date
Jan 15, 2026
Close: Jan 15, 2026
This solicitation requests all supervision, labor, materials, equipment, and services to rehabilitate the Village of Wilson’s wastewater treatment plant (oxidation pond) and three sewer pump stations. The project is funded through the Louisiana Department of Environmental Quality State Revolving Fund (LDEQ SRF Loan #CS221965-01) and requires a bid guarantee equal to at least 5% of the total bid. Bids are due by 10:00 AM on January 15, 2026 (submit electronically via Central Bidding or hand-deliver to Village of Wilson Town Hall), with a pre-bid conference on January 8, 2026 at 10:00 AM.
Release: Dec 23, 2025
Close: Jan 22, 2026
Chemicals for wastewater treatment plant.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →