Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project generally consists of approx 2,900 LF of 8" Ductile Iron Watermain; 2,400 LF of 1" HDPE Water service pipe; 4,370 LF of asphalt patching; 350 LF of Curb Replacement; 1,850 LF of replace sidewalk panels; 54 LF of 24" CMP irrigation culvert.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
2" galvanized water main replacements little rock/wrightsville 2026 phase 1 installation of approx. 5,800 LF Of 6" ductile iron potable water main and 2,700 LF 3" PVC potable water main.
Posted Date
Jan 10, 2026
Due Date
Feb 3, 2026
Release: Jan 10, 2026
Close: Feb 3, 2026
2" galvanized water main replacements little rock/wrightsville 2026 phase 1 installation of approx. 5,800 LF Of 6" ductile iron potable water main and 2,700 LF 3" PVC potable water main.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 4,005 LF 12" pvc sdr 26 sewer main, 700 LF 8" pvc sdr 26 sewer main, 16 EA 4' inside dia concrete manhole, 73 EA 4' id manhole over 6' deep, 58 EA sewer service reconnection, 1,020 LF asphalt surface repair, 240 LF concrete surface repair, 3,100 SY solid slab sodding, 1 LS erosion control, 1 LS sewer flow control, 1 LS traffic control.
Posted Date
Jan 15, 2026
Due Date
Feb 6, 2026
Release: Jan 15, 2026
Close: Feb 6, 2026
Work includes 4,005 LF 12" pvc sdr 26 sewer main, 700 LF 8" pvc sdr 26 sewer main, 16 EA 4' inside dia concrete manhole, 73 EA 4' id manhole over 6' deep, 58 EA sewer service reconnection, 1,020 LF asphalt surface repair, 240 LF concrete surface repair, 3,100 SY solid slab sodding, 1 LS erosion control, 1 LS sewer flow control, 1 LS traffic control.
AvailableThe City of Hurst is soliciting bids for the 2025 Miscellaneous Water Replacements project to replace existing 12-inch, 10-inch, and 8-inch water mains and perform associated pavement and landscaping restoration, traffic control, and resident coordination. The solicitation is identified as RFB #26-002, was posted on 2026-01-12, and estimates the project value in the $500,000$2,000,000 range. Bids are due on 2026-01-28 and the opportunity is open (not a grant) as of 2026-01-13.
Posted Date
Jan 12, 2026
Due Date
Jan 28, 2026
Release: Jan 12, 2026
Close: Jan 28, 2026
The City of Hurst is soliciting bids for the 2025 Miscellaneous Water Replacements project to replace existing 12-inch, 10-inch, and 8-inch water mains and perform associated pavement and landscaping restoration, traffic control, and resident coordination. The solicitation is identified as RFB #26-002, was posted on 2026-01-12, and estimates the project value in the $500,000$2,000,000 range. Bids are due on 2026-01-28 and the opportunity is open (not a grant) as of 2026-01-13.
AvailableWater Main Replacement, includes replacing water mains downstream of the new 1 MG water storage tank. The Water Main Replacement
Posted Date
Dec 14, 2025
Due Date
Jan 28, 2026
Release: Dec 14, 2025
Close: Jan 28, 2026
Water Main Replacement, includes replacing water mains downstream of the new 1 MG water storage tank. The Water Main Replacement
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →