Summary
Bid pack #1: classroom building: replacement of the air-cooled chiller and the main chilled water pumps. Replacement of the heating plant complete with new boilers, venting, system pumps and air separator and piping replacement in the mechanical room. Reconnect all these components to the existing control system in the building. Provide limiting valves under all sinks. Bid pack #2: multipurpose building: replacement of the heating plant complete with new boilers, venting, system pumps and air separator and piping replacement in the mechanical room. Reconnect all these components to the existing control system in the building. Provide limiting valves under all sinks.