Medical University Of South Carolina
Higher EducationSC
Posted
Sep 1, 2026
Sep 29, 2026
Basic Science Building 7 East Lab and Office Renovations - Phase A (Design-Bid-Build)
Renovation of approximately 1,991 SF of open shell area of BS741 into one laboratory and two tissue culture rooms. Work includes new wood doors, metal door frames, gypsum board walls, acoustical ceilings, sheet flooring, finishes, and associated mechanical, electrical, and plumbing.