Summary
Remove all existing 8" water pipe where open cut is allowed as noted. The segment beneath Ash Street is to be abandoned in place, grouted, and capped so not to disturb the existing asphalt and curbing. Provide and install new 8" C900 water pipe in place of the old water pipe as it is removed. Connect new water pipe to valve located in front of Building 1005 to the valve located on the west side of Ash Street at Building 1106. Pipe joints shall be push-on restrained joints. Mechanical joint fittings shall be double restrained. Provide concrete thrust blocks at all fittings and valves in accordance with the detail on this sheet. All fittings shall be ductile iron, conforming to AWWA C153 or C110 cement-mortar lined per AWWA C104. See attached file.