Retrieving RFP details
Release
Close
North Texas Municipal Water District
Construction of a 32 mgd sanitary sewer lift station consisting of 5 vertical centrifugal non-clog pumps with 500 horsepower motors and variable frequency drives. Also included in this project is a new electrical building, a new odor control carbon scrubber system, a new diesel generator, yard structures and site paving. The lift station includes new fiberglass reinforced pipe for both the influent sewer lines and the discharge force main.
Buffalo Creek Lift Station No
2
City of Eau Claire
Work includes installation of premanufactured lift station, sanitary sewer and force main, sanitary sewer submersible lift station, above grade valve vault, switch gear frame and electrical work, un-classified excavation, grading and graveling, and restoration.
City of Long Beach
Work consists of 1 LS Mobilization and Demobilization; 1 LS Lift Station 2 Improvements; 1 LS Lift Station 5 Improvements; 1 LS Breakers Lift Station Improvements; 10 CY Unsuitable Excavation; 1 LS Lift Station 2 Bypass Pumping; 1 LS Lift Station 5 Bypass Pumping; 1 LS Breakers Lift Station Bypass Pumping; 1 LS Lift Station 2 Electrical; 1 LS Lift Station 5 Electrical; 1 LS Breakers Lift Station Electrical.
City of Bethel
The project scope consists of replacing the pumps, controls, and heat add system for the QFC lift station and providing temporary bypass pumping.
Release
Oct 08, 2025
Close
Nov 13, 2025