Summary
Project consists of 4 EA 2" PVC elbow 9" raduis; EA 2" PVC secondary conduit installed in directional bore; 740 LF 2" PVC secondary conduit installed in trench; 6,060 LF 4" HDPE-sdr-11 primary conduit installed in directional bore; 2,170 LF 4" HDPE -sdr-11 primary conduit installed in trench; 360 LF 60" deep trench 18"-34" wide; 630 LF directional bore to include 3-4" HDPE-sdr-11. Conduits (conduits accounted for in separate line item); 440 LF directional bore to include 9-4" HDPE -sdr-11. Conduits (conduits accounted for in separate line item); 6 EA street light- 30' black galv steel streetlight pole; 6 EA 24" concrete rip rap around streetlight.