Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Supply and delivery of granulated activated carbon for use in the treatment of wastewater air purification.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Sprague Water and Sewer Authority (WSA) is seeking a professional engineering consulting firm to provide general engineering services for a Water Pollution Control Facility Upgrade, including facility plan updates, preliminary and final design, permitting, bidding and construction phase services, engineering reports, environmental reports, and funding/grant support, with significant experience in wastewater treatment and collection systems.
Posted Date
Dec 17, 2025
Due Date
Feb 18, 2026
Release: Dec 17, 2025
Close: Feb 18, 2026
The Sprague Water and Sewer Authority (WSA) is seeking a professional engineering consulting firm to provide general engineering services for a Water Pollution Control Facility Upgrade, including facility plan updates, preliminary and final design, permitting, bidding and construction phase services, engineering reports, environmental reports, and funding/grant support, with significant experience in wastewater treatment and collection systems.
AvailableRemoval and off-site disposal of liquid sludge from the water pollution control facility.
Posted Date
Jan 8, 2026
Due Date
Jan 28, 2026
Release: Jan 8, 2026
Close: Jan 28, 2026
Removal and off-site disposal of liquid sludge from the water pollution control facility.
AvailableFurnishing ozone and granular and biologically activated carbon filtration equipment for direct potable reuse testing facility. Ozone systems, including ambient vaporizer, feed pumps, venturi injector, ozone contactor, and ozone destructs. Granular/biologically activated carbon (GAC/BAC) filtration systems, including standpipe and backwash pumps. Services of manufacturer or manufacturer’s authorized representative.
Posted Date
-
Due Date
Feb 3, 2026
Close: Feb 3, 2026
Furnishing ozone and granular and biologically activated carbon filtration equipment for direct potable reuse testing facility. Ozone systems, including ambient vaporizer, feed pumps, venturi injector, ozone contactor, and ozone destructs. Granular/biologically activated carbon (GAC/BAC) filtration systems, including standpipe and backwash pumps. Services of manufacturer or manufacturer’s authorized representative.
AvailableSupply granular activated carbon and sand filter media on as needed basis.
Posted Date
Jan 8, 2026
Due Date
Feb 9, 2026
Release: Jan 8, 2026
Close: Feb 9, 2026
Supply granular activated carbon and sand filter media on as needed basis.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →