Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
work includes asphalt deep patch milling, standard edge milling, and repaving of all streets.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The Illinois Secretary of State (ILSOS) is soliciting bids for milling and repaving work at the T & TT parking lots north and east of the Illinois State Museum in Springfield, IL. The contractor must mill existing pavement, provide two lifts of paving (1.5" binder + 1.5" surface), perform striping/ADA signage, and supply traffic signage and safety barricades; compliance with building and environmental codes is required. The contract initial term begins upon execution for one year with a maximum cumulative term up to ten years, and a non-mandatory pre-bid conference is listed on the official posting.
Posted Date
Dec 9, 2025
Due Date
Jan 12, 2026
Release: Dec 9, 2025
Close: Jan 12, 2026
Premium
Access the largest public sector contact database
The Illinois Secretary of State (ILSOS) is soliciting bids for milling and repaving work at the T & TT parking lots north and east of the Illinois State Museum in Springfield, IL. The contractor must mill existing pavement, provide two lifts of paving (1.5" binder + 1.5" surface), perform striping/ADA signage, and supply traffic signage and safety barricades; compliance with building and environmental codes is required. The contract initial term begins upon execution for one year with a maximum cumulative term up to ten years, and a non-mandatory pre-bid conference is listed on the official posting.
Contractor shall mill the lot, clean and prep it for paving. Paving to be done in two lifts. 1.5 inches of level binder and 1.5 inches of surface material. All striping, numbering and signage for ADA parking spaces shall also be included. The resulting contract with the awarded Bidder shall have an initial term of upon execution for a one-year term.
Posted Date
Dec 9, 2025
Due Date
Jan 12, 2026
Release: Dec 9, 2025
Close: Jan 12, 2026
Contractor shall mill the lot, clean and prep it for paving. Paving to be done in two lifts. 1.5 inches of level binder and 1.5 inches of surface material. All striping, numbering and signage for ADA parking spaces shall also be included. The resulting contract with the awarded Bidder shall have an initial term of upon execution for a one-year term.
AvailableThis is a streetscape project in the Pratt Neighborhood. The construction consists of roadway, alley, and subdivision improvements, and includes sidewalks, curbs and gutters, ADA ramps, striping, as well as new water service, new sanitary sewer service, new underground electric service and storm water infrastructure. The primary items of work are approximately: Asphalt Binder (630 Ton), Asphalt Seal (320 Ton), Prime Coat (1900 Gal), Heavy Duty Concrete Paving (2500 CY), 4" Concrete Sidewalks (1200 SY), 18" Concrete Curb and Gutter (2750 LF), 4" Ductile Iron Pipe (750 LF), and 8" Ductile Iron Pipe (1365 LF).
Posted Date
Nov 19, 2025
Due Date
Dec 17, 2025
Release: Nov 19, 2025
Close: Dec 17, 2025
This is a streetscape project in the Pratt Neighborhood. The construction consists of roadway, alley, and subdivision improvements, and includes sidewalks, curbs and gutters, ADA ramps, striping, as well as new water service, new sanitary sewer service, new underground electric service and storm water infrastructure. The primary items of work are approximately: Asphalt Binder (630 Ton), Asphalt Seal (320 Ton), Prime Coat (1900 Gal), Heavy Duty Concrete Paving (2500 CY), 4" Concrete Sidewalks (1200 SY), 18" Concrete Curb and Gutter (2750 LF), 4" Ductile Iron Pipe (750 LF), and 8" Ductile Iron Pipe (1365 LF).
AvailableThe project consists of roadway milling and resurfacing of various streets.
Posted Date
Nov 26, 2025
Due Date
Dec 15, 2025
Release: Nov 26, 2025
Close: Dec 15, 2025
The project consists of roadway milling and resurfacing of various streets.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis