Bridge Rehabilitation, Asphalt Milling & Overlay, (52-320-312) BRO 8052(00)26-1, PCN 0AG4 RFP
Work includes bridge rehabilitation, asphalt milling and overlay.
Description: 841 SY Remove Asphalt Concrete Pavement; 873 LF Salvage Beam Guardrail; 191 CY Unclassified/Rock Excavation; 1,528 LF High Build Waterborne Pavement Marking Paint, 4" Yellow; 800 LF Orange Plastic Safety Fence
StateAgency · SD, US
Adjacent opportunities open for bidding right now.
CountySD
Posted
Nov 17, 2026
Dec 14, 2026
Work includes bridge rehabilitation, asphalt milling and overlay.
South Dakota Department of Transportation
State AgencySD
Posted
Nov 16, 2026
Dec 9, 2026
273.90 SF Traffic Control Signs; 5,942 LF Temporary Flexible Vertical Markers (Tabs); 960 LF 4" Temporary Pavement Marking Tape Type I; Bridge Cleaning.
South Dakota Department of Transportation
State AgencySD
Posted
Feb 19, 2024
Dec 2, 2026
Approx.17,468 CY Unclassified Excavation; 1,956 CY Placing Topsoil; 1,748 Ton Asphalt Concrete Composite; 4 EA Precast Concrete Headwall for Drain; 3 EA Reset Sign; 18 Gal High Build Waterborne Pavement Marking Paint, White; 90 ft 4" Perforated Dual Wall HDPE Pipe; 1.800 Ton Fertilizing; 2.100 Ton Mulching. See attached files and outside link.
Posted
Nov 19, 2026
Dec 1, 2026
Provide demolition and removal of designated abandoned structures.
Decision makers connected to this RFP from South Dakota Department of Transportation.
From the first pre-RFP signals to the published RFP and its files.
Board meeting
145 days before RFP
SDDOT recorded a revision changing a local Hill City project from structure replacement to structure removal and reducing its FY 2026 cost to $500,000.
Director Behm presented the following STIP revisions for the Commission's information: INFORMATIONAL REVISIONS FOR THE COMMISSION (work type change, cost update, move fiscal years within the 4-year construction STIP) REV 26-SC-017 This revision changed the scope of work from a structure replacement to "Structure Removal" and decreased the cost of a local…
South Dakota Transportation Commission Meeting Minutes
Board meeting · Jun 25, 2026
Board meeting
19 days before RFP
REV 27-003 was approved by the South Dakota Transportation Commission to add a FY2027 local structure-removal project at Hill City's Museum Drive over an abandoned railroad line with $500,000 planned.
FOR COMMISSION APPROVAL (to add or delete a project in the 4-year construction STIP) REV 27-002 This revision will add a FY2027 Install Buffalo Guard, Lighting project on US385, 7 miles north of Hot Springs in the Rapid City Region. FY 2027 Plus $267,000 REV 27-003 This revision will add a Local Structure Removal project at the edge of Hill City on Museum…
RFP published
Proposals due (15 days left)
South Dakota Transportation Commission Meeting Minutes
Board meeting · Oct 29, 2026