Summary
Project consists of installing two new exterior main service disconnects on two existing electrical services. Relocating existing transformer and providing new CT enclosure, CT meter, and 1000 Amp main exterior service disconnect. Includes trenching primary and secondary transformer conduits, replacing asphalt, installing new transformer base, providing new secondary conductors and panel feeders. Replacing existing 1200A switchboard with new 1000A relocated distribution panel. Refeeding all existing panels indicated in drawings from new 1000A distribution panel. Converting old switchboard room into a closet. Fixing upstairs electrical room to be code compliant including putting emergency ATS and Panel “E” in a 2-hour fire rated room, relocating existing duct currently running across panel clearances, adding panic bar onto electrical room door, and patching sheet rock holes in electrical room. Removing old transformer vault and replacing it with new concrete pad to relocate existing shed.