Summary
Work includes mobilization - demobilization 1 LS; exploratory excavation 12 HR; rock excavation 16 HR; tank site grading (general fill) 1 LS; unclassified excavation 1 LS; structural fill import 1 ls; general fill import 1 LS; tank site topsoil import 1 LS; 3/4" crushed gravel leveling course import 1 LS; gravel site improvements 5600 SF; improvements to existing access road 1 LS; surface restoration and seeding 1 LS; existing tank feed line demolition 100 LF; 12" DIPS DR 17 HDPE pipe 148 LF; 12" class 53 ductile iron pipe 38 LF: 12" C900 DR25 PVC pipe 130 LF; 6" DIPS DR17 HDPE pipe 65 LF; 6" class 53 ductile iron pipe 6 LF; 6" C900 DR25 PVC pipe 60 LF. See attached file.