Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Full restoration of the interior coatings and exterior overcoats of the Boston Rd. Water Storage Tank (7.5MG) and Crosby Hill WST (1MG).
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Installation of cathodic protection systems for the tank walls and tank floors. Cleaning, preparation, and lining of the interior of the reclamation water storage tanks, including all columns and piping within the tanks. Sealing of the roof to rim angle connection and the roof lap seams in the reclamation water storage tanks. Installation of grounding assemblies for each tank. Safety sign postage at each tank.
Posted Date
Jan 13, 2026
Due Date
Feb 13, 2026
Release: Jan 13, 2026
Close: Feb 13, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Installation of cathodic protection systems for the tank walls and tank floors. Cleaning, preparation, and lining of the interior of the reclamation water storage tanks, including all columns and piping within the tanks. Sealing of the roof to rim angle connection and the roof lap seams in the reclamation water storage tanks. Installation of grounding assemblies for each tank. Safety sign postage at each tank.
Construction services for the water storage tanks 3 and 4 upgrades. Additive bid item #1 - all upgrades to tank 4, additive bid item #2 - replace bottom 6 ft of siding on both tanks, additive bid item #3 - repaint remaining siding on both tanks.
Posted Date
Dec 10, 2025
Due Date
Jan 22, 2026
Release: Dec 10, 2025
Close: Jan 22, 2026
Construction services for the water storage tanks 3 and 4 upgrades. Additive bid item #1 - all upgrades to tank 4, additive bid item #2 - replace bottom 6 ft of siding on both tanks, additive bid item #3 - repaint remaining siding on both tanks.
AvailableThe City of Cotter, Arkansas is soliciting proposals for painting and rehabilitation of two water storage tanks (a 90x30 welded steel standpipe and a 12x44' riveted ground storage tank). Firms must provide a price for rehabilitation of each tank and submit sealed proposals with a 5% bid bond; proposals must be mailed or delivered to Cotter City Hall. The City reserves the right to waive formalities and reject any or all proposals; the RFP/specifications are available from the Cotter Mayor (mayor@cotterar.gov) or at City Hall.
Posted Date
Dec 7, 2025
Due Date
Jan 27, 2026
Release: Dec 7, 2025
Close: Jan 27, 2026
The City of Cotter, Arkansas is soliciting proposals for painting and rehabilitation of two water storage tanks (a 90x30 welded steel standpipe and a 12x44' riveted ground storage tank). Firms must provide a price for rehabilitation of each tank and submit sealed proposals with a 5% bid bond; proposals must be mailed or delivered to Cotter City Hall. The City reserves the right to waive formalities and reject any or all proposals; the RFP/specifications are available from the Cotter Mayor (mayor@cotterar.gov) or at City Hall.
AvailableWork consists of rehabilitation of filter tanks at water treatment plant. The goal of this project is to restore the filtration system to full operational condition, ensure continued reliability and water quality, and complete all work with minimal disruption to plant operations and water service.
Posted Date
Nov 20, 2025
Due Date
Jan 19, 2026
Release: Nov 20, 2025
Close: Jan 19, 2026
Work consists of rehabilitation of filter tanks at water treatment plant. The goal of this project is to restore the filtration system to full operational condition, ensure continued reliability and water quality, and complete all work with minimal disruption to plant operations and water service.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →