Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Borough of Chambersburg
Project consists of water main extension project. See attached file.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Village of Catskill
Work consists of construction of a new HDPE 10" DR13.5 water main and wet well to valve vault conversion, and metering to provide a municipal water supply to the country estates mobile home park.
Posted Date
Oct 17, 2025
Due Date
Nov 19, 2025
Release: Oct 17, 2025
Village of Catskill
Close: Nov 19, 2025
Work consists of construction of a new HDPE 10" DR13.5 water main and wet well to valve vault conversion, and metering to provide a municipal water supply to the country estates mobile home park.
AvailableTown of Jones
Work consist of 3,300 LF of 12" pvc water main, 10 LF of 6" PVC water main, 1,410 LF of directional bore & install 12" water main, 35 LF of directional bore & install 6" water main, 8 EA of PVC to pe transition, 55 LF of bore & install 18" steel casing, 450 LF of slick bore, 88 SY of gravel repair, 6 SY of remove & repair concrete, 1 EA of 12" interconnection, 10 EA of 12" gate valve & box, 2,200 SY of solid slab sodding, 7 EA of 6" fire hydrant assembly, 3 EA of 2" air/vacuum release valve. See attached file.
Posted Date
-
Due Date
Nov 20, 2025
Release: -
Town of Jones
Close: Nov 20, 2025
Work consist of 3,300 LF of 12" pvc water main, 10 LF of 6" PVC water main, 1,410 LF of directional bore & install 12" water main, 35 LF of directional bore & install 6" water main, 8 EA of PVC to pe transition, 55 LF of bore & install 18" steel casing, 450 LF of slick bore, 88 SY of gravel repair, 6 SY of remove & repair concrete, 1 EA of 12" interconnection, 10 EA of 12" gate valve & box, 2,200 SY of solid slab sodding, 7 EA of 6" fire hydrant assembly, 3 EA of 2" air/vacuum release valve. See attached file.
AvailableBorough of Chambersburg
Provide aerial photography.
Posted Date
Nov 3, 2025
Due Date
Dec 19, 2025
Release: Nov 3, 2025
Borough of Chambersburg
Close: Dec 19, 2025
Provide aerial photography.
AvailableCalvert County
Project consist of 12" LF, furnish and install PVC restrained joint water main; 12" LF, furnish and install directionally drilled pipeline; furnish and install air release valve; 20 CY, contingent unclassified excavation; 20 TN, contingent porous fill #57 stone; 20 TN, contingent CR-6 (crusher run) graded aggregate; 10 CY, contingent miscellaneous concrete; 10 TN, contingent hotmix asphalt pavement; 50 CY, contingent off-site borrow. See attached files and outside link.
Posted Date
Aug 15, 2025
Due Date
Nov 20, 2025
Release: Aug 15, 2025
Calvert County
Close: Nov 20, 2025
Project consist of 12" LF, furnish and install PVC restrained joint water main; 12" LF, furnish and install directionally drilled pipeline; furnish and install air release valve; 20 CY, contingent unclassified excavation; 20 TN, contingent porous fill #57 stone; 20 TN, contingent CR-6 (crusher run) graded aggregate; 10 CY, contingent miscellaneous concrete; 10 TN, contingent hotmix asphalt pavement; 50 CY, contingent off-site borrow. See attached files and outside link.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis