Work includes 1 LS erosion control (protection of work); 1 LS clear and grub; 1 LS offloading of 102" owner furnished; 1 LS cut into existing 16" water line at station 135+77. 43 and install salvaged 16"x16"x16"x16" compact steel cross and valves; 151 LF furnish and install 12" pvc class 200, awwa c-905 domestic waterline with restrained joints; 135 LF furnish and install 12" cml&c, full weld (double pass) all joints, 10 gauge steel domestic waterline, trench and backfill; 1 EA furnish and install fire hydrant assembly. See outsidelink.
Town of Longmeadow
Work includes approx 11,985 LF 8" cement line DI water mains; 1 LS bypass water main; 4,620 LF 1" copper tubing; 260 VF rehabilitate manhole sewer by cementitious liner; 6,130 LF 8" IPP structural liner; 43,000 SY full width milling (cold plane). See attached file.
City of Pevely
Work includes storm water improvements within the city and provides for storm sewer pipe and structure installation, wall construction, fence relocation, restoration, traffic control and other incidental items and work.
The Ohio State University
Project consists of the removal and replacement of existing domestic cold water service lines to arps hall, 209 maintenance building, and electroscience laboratory. The scope also includes improvements to the carmack ditch immediately north of the sherman arts center.
Release
Oct 14, 2025
Close
Nov 04, 2025