Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consists, in general, of excavating the existing roadway, then applying 9" of new roadway base and 3" of new hot mix asphalt. The project also includes the replacement of curb ramps - 1,630 TN of HNA paving; 4,300 TN of class 2 aggregate base rock; 2,080 SY of paint stripping; 2 EA of PCC curb ramps.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Release: Nov 19, 2025
Close: Jan 7, 2026
Street rehabilitation project.
AvailableConstruction contract for street rehabilitation: approximately 9 lane-miles of mill-and-overlay plus associated curb & gutter, ADA ramps, and spot base repairs. Unit-price, measured-quantity contract with locations/quantities adjusted by the City; electronic bid submission via QuestCDN required; mandatory pre-bid conference; bid bond (5%) and 100% performance/payment bonds required; project manual available for $22 download fee.
Posted Date
Nov 22, 2025
Due Date
Jan 13, 2026
Release: Nov 22, 2025
Close: Jan 13, 2026
Construction contract for street rehabilitation: approximately 9 lane-miles of mill-and-overlay plus associated curb & gutter, ADA ramps, and spot base repairs. Unit-price, measured-quantity contract with locations/quantities adjusted by the City; electronic bid submission via QuestCDN required; mandatory pre-bid conference; bid bond (5%) and 100% performance/payment bonds required; project manual available for $22 download fee.
AvailableThe project involves the demolition and replacement of asphalt surfaces, concrete sidewalks, curbs, gutters, valley pan and associated crushed base and excavation.
Posted Date
Dec 11, 2025
Due Date
Jan 15, 2026
Release: Dec 11, 2025
Close: Jan 15, 2026
The project involves the demolition and replacement of asphalt surfaces, concrete sidewalks, curbs, gutters, valley pan and associated crushed base and excavation.
AvailableThe City of Belleair Beach is soliciting bids for the B25-03 8th Street Stormwater Rehabilitation Project to rehabilitate stormwater pipes on 8th Street, including general and heavy construction and storm drain repair/cleaning services. The procurement is an Invitation to Bid (ITB) with electronic bidding enabled and a non-mandatory site inspection option; contractors must obtain verbal permission from property owners before entering private property. The bid package is distributed by DemandStar and the bid opening is scheduled for January 9, 2026 at 2:00 PM Eastern.
Posted Date
Dec 8, 2025
Due Date
Jan 9, 2026
Release: Dec 8, 2025
Close: Jan 9, 2026
The City of Belleair Beach is soliciting bids for the B25-03 8th Street Stormwater Rehabilitation Project to rehabilitate stormwater pipes on 8th Street, including general and heavy construction and storm drain repair/cleaning services. The procurement is an Invitation to Bid (ITB) with electronic bidding enabled and a non-mandatory site inspection option; contractors must obtain verbal permission from property owners before entering private property. The bid package is distributed by DemandStar and the bid opening is scheduled for January 9, 2026 at 2:00 PM Eastern.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →