Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
260-Network Contract Office 20 (36C260)
Requirement for a Contractor to boiler water treatment and commissioning services for QTY1EA boiler.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Forsyth County School District
Accepting proposals for HVAC and boiler water services.
Posted Date
Nov 11, 2025
Due Date
Dec 11, 2025
Release: Nov 11, 2025
Forsyth County School District
Close: Dec 11, 2025
Accepting proposals for HVAC and boiler water services.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Corpus Christi Independent School District
Work includes providing complete water treatment services for all condenser water, chilled water, hot water heating, and steam boiler systems at multiple CCISD facilities, including supplying chemicals, maintaining treatment equipment, performing required testing and reporting, controlling scale, corrosion, and biological growth, ensuring regulatory compliance, replacing failed components at no cost to the District, supporting annual inspections, and maintaining accurate system records.
Posted Date
Nov 26, 2025
Due Date
Dec 12, 2025
Release: Nov 26, 2025
Corpus Christi Independent School District
Close: Dec 12, 2025
Work includes providing complete water treatment services for all condenser water, chilled water, hot water heating, and steam boiler systems at multiple CCISD facilities, including supplying chemicals, maintaining treatment equipment, performing required testing and reporting, controlling scale, corrosion, and biological growth, ensuring regulatory compliance, replacing failed components at no cost to the District, supporting annual inspections, and maintaining accurate system records.
AvailableCity of Santa Rosa
Provide pool boiler cleaning, maintenance, and repair services.
Posted Date
Nov 17, 2025
Due Date
Dec 16, 2025
Release: Nov 17, 2025
City of Santa Rosa
Close: Dec 16, 2025
Provide pool boiler cleaning, maintenance, and repair services.
AvailableColumbia School District 93
Boiler, chilled/hot water, GSHP and condenser water loop treatment shall include, but not limited to: pricing for the water treatment program at all cooling towers/condenser water loops, closed chill and hot water loops, GSHP closed water loops, and boilers/steam systems. Contract will be from 04/01/26 thru 06/30/27, subject to renewal for two consecutive one-year periods. Pre-bid inspections can be made prior to the bid due date by contacting Colton Davidson of Facilities and Construction Services via phone at 573-289-4604 or email at CDavidson@cpsk12.org.
Posted Date
-
Due Date
Dec 10, 2025
Columbia School District 93
Close: Dec 10, 2025
Boiler, chilled/hot water, GSHP and condenser water loop treatment shall include, but not limited to: pricing for the water treatment program at all cooling towers/condenser water loops, closed chill and hot water loops, GSHP closed water loops, and boilers/steam systems. Contract will be from 04/01/26 thru 06/30/27, subject to renewal for two consecutive one-year periods. Pre-bid inspections can be made prior to the bid due date by contacting Colton Davidson of Facilities and Construction Services via phone at 573-289-4604 or email at CDavidson@cpsk12.org.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →