Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Replacement of the boilers and related systems and equipment serving NRG Park within the existing boiler Plant.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Boiler replacement.
Posted Date
Jan 19, 2026
Due Date
Feb 13, 2026
Release: Jan 19, 2026
Close: Feb 13, 2026
Boiler replacement.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide installation of a new replacement boiler/burner unit. The project essentially consists of revised replacement of the existing failed boiler #2 at the site, with replacement of system piping elements as required to/from existing hydronic system points of connection. Work include demolition; equipment rigging; boiler installation; hydronic piping; domestic water piping; burner installation; fuel oil piping and specialties installation. See attached file.
Posted Date
Jan 21, 2026
Due Date
Feb 2, 2026
Release: Jan 21, 2026
Close: Feb 2, 2026
Provide installation of a new replacement boiler/burner unit. The project essentially consists of revised replacement of the existing failed boiler #2 at the site, with replacement of system piping elements as required to/from existing hydronic system points of connection. Work include demolition; equipment rigging; boiler installation; hydronic piping; domestic water piping; burner installation; fuel oil piping and specialties installation. See attached file.
AvailableDolores School District RE-4A is soliciting sealed proposals to remove an existing Raypak boiler and install new Lochinvar high‑efficiency, modulating boilers serving the Commons area. The scope includes demolition/removal, installation of new boilers and associated systems, controls integration, commissioning, and a mandatory site walk. Issued January 23, 2026, proposals are due February 11, 2026.
Posted Date
Jan 23, 2026
Due Date
Feb 11, 2026
Release: Jan 23, 2026
Close: Feb 11, 2026
Dolores School District RE-4A is soliciting sealed proposals to remove an existing Raypak boiler and install new Lochinvar high‑efficiency, modulating boilers serving the Commons area. The scope includes demolition/removal, installation of new boilers and associated systems, controls integration, commissioning, and a mandatory site walk. Issued January 23, 2026, proposals are due February 11, 2026.
AvailableBoiler replacement.
Posted Date
Jan 5, 2026
Due Date
Feb 4, 2026
Release: Jan 5, 2026
Close: Feb 4, 2026
Boiler replacement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →