Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Remove and dispose of the existing boilers and water heaters in residential units and install new boilers and water heaters.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Construction of water distribution system pipelines & components replacing existing water infrastructure consisting of approx 50,667 LF of 8" dia pipelines and 7,581 LF of 12" diameter pipelines. The project will include all pipes, associated valves, fittings hydrants, & water appurtenances, encasements, water service line & meter replacement, cutting & patching of streets, all testing, disinfection, swppp measures, traffic control.
Posted Date
-
Due Date
Jan 29, 2026
Close: Jan 29, 2026
Construction of water distribution system pipelines & components replacing existing water infrastructure consisting of approx 50,667 LF of 8" dia pipelines and 7,581 LF of 12" diameter pipelines. The project will include all pipes, associated valves, fittings hydrants, & water appurtenances, encasements, water service line & meter replacement, cutting & patching of streets, all testing, disinfection, swppp measures, traffic control.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Commercial water heater replacement.
Posted Date
Dec 18, 2025
Due Date
Jan 16, 2026
Release: Dec 18, 2025
Close: Jan 16, 2026
Commercial water heater replacement.
AvailableProvide boiler replacement.
Posted Date
Dec 8, 2025
Due Date
Jan 5, 2026
Release: Dec 8, 2025
Close: Jan 5, 2026
Provide boiler replacement.
AvailableThe City of Angels (Angels Camp, CA) is soliciting proposals for a Water Meter Replacement Project in two phases to replace 1,822 residential water meters with automatic meter reading units furnished by the City. Work includes three levels of meter replacement (simple remove-and-replace, excavation and replacement, and excavation with piping modification) and must be completed within 270 calendar days from Notice to Proceed; the Engineer's Estimate is $2,400,000. A mandatory pre-bid meeting is scheduled for December 16, 2025, and the bid closes on January 8, 2026.
Posted Date
Dec 3, 2025
Due Date
Jan 8, 2026
Release: Dec 3, 2025
Close: Jan 8, 2026
The City of Angels (Angels Camp, CA) is soliciting proposals for a Water Meter Replacement Project in two phases to replace 1,822 residential water meters with automatic meter reading units furnished by the City. Work includes three levels of meter replacement (simple remove-and-replace, excavation and replacement, and excavation with piping modification) and must be completed within 270 calendar days from Notice to Proceed; the Engineer's Estimate is $2,400,000. A mandatory pre-bid meeting is scheduled for December 16, 2025, and the bid closes on January 8, 2026.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →