Summary
Work includes necessary repairs and partial roof replacement; removal of existing membrane roofing system, insulation, cant strips and tapered edges,and metal flashings; removal and offsite disposal of hazardous materials; removal and replacement of deteriorated roof decking and wood blocking; provision and installation of new roof hatch and safety railing; removal and disposal of existing skylights, and structural deck infill to match existing assembly; removal and replacement of existing roof drains and related piping and insulation; provision and installation of epdm membranes, underlayment, and flat and tapered insulations provision and installation of new flashings, caps, fasciae, and other trim metal work as detailed and specified, including new scuppers.