Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Providing an opportunity for boat vendors and tour companies expedited access to the park to get boats in the water and shuttle in their customers when the park reaches capacity. The current permit is $400/month for May – August with September being included for free.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Rental of a Bucket Boat with an operator. Sixty Five (65) foot straight boom man lift. 250 CFP minimum portable air compressor, with pneumatic grinders and chisels; The contract will have an initial term commencing upon the last dated signature of the Parties and ending 36 months from execution.
Posted Date
Jul 9, 2025
Due Date
Feb 18, 2026
Release: Jul 9, 2025
Close: Feb 18, 2026
Rental of a Bucket Boat with an operator. Sixty Five (65) foot straight boom man lift. 250 CFP minimum portable air compressor, with pneumatic grinders and chisels; The contract will have an initial term commencing upon the last dated signature of the Parties and ending 36 months from execution.
AvailableThe Florida Fish and Wildlife Conservation Commission is procuring Boat Operations Training Services as a single-source procurement to provide nationally recognized BOAT program courses. The intended single source is the National Association of State Boating Law Administrators, which is the only authorized provider of the nationally credentialed BOAT program recognized by states and the U.S. Coast Guard. The contract period is scheduled from July 2, 2026, through July 1, 2029, with a response deadline of February 18, 2026.
Posted Date
Jan 26, 2026
Due Date
Feb 18, 2026
Release: Jan 26, 2026
Close: Feb 18, 2026
The Florida Fish and Wildlife Conservation Commission is procuring Boat Operations Training Services as a single-source procurement to provide nationally recognized BOAT program courses. The intended single source is the National Association of State Boating Law Administrators, which is the only authorized provider of the nationally credentialed BOAT program recognized by states and the U.S. Coast Guard. The contract period is scheduled from July 2, 2026, through July 1, 2029, with a response deadline of February 18, 2026.
AvailableConstruct a gable boat house roof and install a boat lift. R panel gable boat house roof with appropriate pilings. (minimum size 44' x 30'), with hoist capabilities (min 500lb capacity to remove fire pump from front of boat) with appropriate windstorm certificates and engineered drawings. Construction shall use durable, marine-grade materials. The boat house should tie in as applicable to the existing docks, but not physically attach to the concrete bulkhead. Install a boat lift at the existing dock. This boat lift should be a golden 10k deluxe boat lift with a 750 series power drive system, or a similar model. Secure mounting to existing dock structures with minimal disruptions to ongoing harbor operations. See outside link.
Posted Date
-
Due Date
Feb 5, 2026
Release: -
Close: Feb 5, 2026
Construct a gable boat house roof and install a boat lift. R panel gable boat house roof with appropriate pilings. (minimum size 44' x 30'), with hoist capabilities (min 500lb capacity to remove fire pump from front of boat) with appropriate windstorm certificates and engineered drawings. Construction shall use durable, marine-grade materials. The boat house should tie in as applicable to the existing docks, but not physically attach to the concrete bulkhead. Install a boat lift at the existing dock. This boat lift should be a golden 10k deluxe boat lift with a 750 series power drive system, or a similar model. Secure mounting to existing dock structures with minimal disruptions to ongoing harbor operations. See outside link.
AvailableSupply of 2023 or newer patrol boat and trailer.
Posted Date
Jan 28, 2026
Due Date
Feb 19, 2026
Release: Jan 28, 2026
Close: Feb 19, 2026
Supply of 2023 or newer patrol boat and trailer.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →