Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Repair boardwalk and related areas.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Boardwalk and retaining wall repairs. Replace 800 SF of 2"-thick x 6"-wide pressure-treated boardwalk, replace 1,120 SF of 2"-thick x 6"-wide pressure-treated boardwalk. Replace 201 CF of retaining wall. See attached file.
Posted Date
Dec 1, 2025
Due Date
Jan 14, 2026
Release: Dec 1, 2025
Close: Jan 14, 2026
Boardwalk and retaining wall repairs. Replace 800 SF of 2"-thick x 6"-wide pressure-treated boardwalk, replace 1,120 SF of 2"-thick x 6"-wide pressure-treated boardwalk. Replace 201 CF of retaining wall. See attached file.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project involves the rebuild and replacement of a boardwalk system that was demolished with a previous project. The project will include the installation of new concrete foundation with helical piles, reinforced concrete retaining wall, concrete abutment, and concrete wingwall. Boardwalk will be constructed of plastic lumber for joists, decking, and railing. Railing panels are Weld Wire Mesh panels and steel post for railing. Grubbing and stump removal, erosion control, safety fencing, rip rap dissipator outlets, grassing, seeding, straw and matting. Other amenities include benches and chairs on deck, bike rack, removal bollards, bollard gates, lights, fence, fence gates, and landscaping.
Posted Date
Dec 17, 2025
Due Date
Jan 22, 2026
Release: Dec 17, 2025
Close: Jan 22, 2026
The project involves the rebuild and replacement of a boardwalk system that was demolished with a previous project. The project will include the installation of new concrete foundation with helical piles, reinforced concrete retaining wall, concrete abutment, and concrete wingwall. Boardwalk will be constructed of plastic lumber for joists, decking, and railing. Railing panels are Weld Wire Mesh panels and steel post for railing. Grubbing and stump removal, erosion control, safety fencing, rip rap dissipator outlets, grassing, seeding, straw and matting. Other amenities include benches and chairs on deck, bike rack, removal bollards, bollard gates, lights, fence, fence gates, and landscaping.
AvailableThe Town of Sullivan's Island is soliciting bids to demolish, replace, and extend the existing 700-foot boardwalk at Station 24. The solicitation is an Invitation for Bid for construction services and includes requirements for demolition, replacement, and extension of the boardwalk. Bids are due January 16, 2026 at 4:00 PM local time.
Posted Date
Dec 5, 2025
Due Date
Jan 16, 2026
Release: Dec 5, 2025
Close: Jan 16, 2026
The Town of Sullivan's Island is soliciting bids to demolish, replace, and extend the existing 700-foot boardwalk at Station 24. The solicitation is an Invitation for Bid for construction services and includes requirements for demolition, replacement, and extension of the boardwalk. Bids are due January 16, 2026 at 4:00 PM local time.
AvailableBoardwalk rehabilitation and parking lot expansion.
Posted Date
Nov 10, 2025
Due Date
Jan 8, 2026
Release: Nov 10, 2025
Close: Jan 8, 2026
Boardwalk rehabilitation and parking lot expansion.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →