Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Replace approx. fifty (50) timber deck boards and provide and install six (6) replacement timber columns at the Blue Heron Pedestrian Bridge. Work includes: Replace approx 50 timber deck boards; install six replacement timber columns; temp traffic control measures includes 1 LS provide and install temporary construction works, jacking, work platforms and containment platform(s), 50 EA demolition - Remove and Dispose of (50) Timber Deck Boards identified and marked by City Maintenance Staff, 50 EA provide and install (50) replacement timber deck boards, 1 LS Install Slip Resistant Matting, Stainless Steel Washers, and Stainless-Steel Wood Screws, 6 EA provide and install (6) timber columns.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Procurement of services for the replacement of timber deck boards and columns on the Blue Heron Pedestrian Bridge.
Posted Date
Jan 5, 2026
Due Date
Feb 12, 2026
Release: Jan 5, 2026
Close: Feb 12, 2026
Procurement of services for the replacement of timber deck boards and columns on the Blue Heron Pedestrian Bridge.
AvailableProcurement of services for the dismantling and removal of an existing pedestrian bridge superstructure, and the design, fabrication, furnishing, and installation of a replacement prefabricated pedestrian bridge superstructure.
Posted Date
Jan 6, 2026
Due Date
Jan 22, 2026
Release: Jan 6, 2026
Close: Jan 22, 2026
Procurement of services for the dismantling and removal of an existing pedestrian bridge superstructure, and the design, fabrication, furnishing, and installation of a replacement prefabricated pedestrian bridge superstructure.
AvailableThe Town of Glastonbury issued an Invitation to Bid (ITB) for the dismantling and removal of the existing House Street pedestrian bridge superstructure and the design, fabrication, furnishing and installation of a replacement prefabricated pedestrian bridge superstructure attached to existing abutments. The work is subject to Connecticut prevailing wage requirements and requires bidders to provide bid security (Bid Bond of at least 10% of the base bid). Bids must be submitted online via the Town of Glastonbury Bonfire portal under bid ID GL-2026-18 by the stated deadline.
Posted Date
Jan 6, 2026
Due Date
Jan 22, 2026
Release: Jan 6, 2026
Close: Jan 22, 2026
The Town of Glastonbury issued an Invitation to Bid (ITB) for the dismantling and removal of the existing House Street pedestrian bridge superstructure and the design, fabrication, furnishing and installation of a replacement prefabricated pedestrian bridge superstructure attached to existing abutments. The work is subject to Connecticut prevailing wage requirements and requires bidders to provide bid security (Bid Bond of at least 10% of the base bid). Bids must be submitted online via the Town of Glastonbury Bonfire portal under bid ID GL-2026-18 by the stated deadline.
Pedestrian bridge construction. This project consists of the construction of a pre-fabricated steel pedestrian bridge approx 260' length at the end of the existing boardwalk in Johnson Park. Construction includes clearing & grubbing, grading, erosion control, drainage, plazas, concrete and paver sidewalk, boardwalk, gateway structures and other items of work.
Posted Date
-
Due Date
Jan 28, 2026
Close: Jan 28, 2026
Pedestrian bridge construction. This project consists of the construction of a pre-fabricated steel pedestrian bridge approx 260' length at the end of the existing boardwalk in Johnson Park. Construction includes clearing & grubbing, grading, erosion control, drainage, plazas, concrete and paver sidewalk, boardwalk, gateway structures and other items of work.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis