Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide bldg. 4 engineering HVAC & roof damage. The contractor shall furnish all labor, materials, tools, supervision, test equipment, shop drawings, technical manuals, transportation, calculations, and safety, necessary to replace floors.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Engineering hvac & roof damage. Provide all necessary labor and material to repair and correct listed deficiencies; this includes but is not limited to the installation of a 6-ton split system AC unit with heat pump capabilities, roof leak correction, installation of bathroom exhaust systems, and paint. Furnish and install a 6-ton or similar split system AC and heat pump unit, such as MXZ-SM72TAM-U1 Mitsubishi Smart Multi 6 Ton/72,000 BTU 208/230V 3-Phase Multi-Zone Heat Pump Mini Split Outdoor Unit, on the roof.
Posted Date
Dec 31, 2025
Due Date
Jan 20, 2026
Release: Dec 31, 2025
Close: Jan 20, 2026
Engineering hvac & roof damage. Provide all necessary labor and material to repair and correct listed deficiencies; this includes but is not limited to the installation of a 6-ton split system AC unit with heat pump capabilities, roof leak correction, installation of bathroom exhaust systems, and paint. Furnish and install a 6-ton or similar split system AC and heat pump unit, such as MXZ-SM72TAM-U1 Mitsubishi Smart Multi 6 Ton/72,000 BTU 208/230V 3-Phase Multi-Zone Heat Pump Mini Split Outdoor Unit, on the roof.
AvailableThe Department of Veterans Affairs (Network Contract Office 02) issued a presolicitation for construction repairs (HVAC, roof damage and replacement of floors) at the Brooklyn VA Medical Center (800 Poly Place, Brooklyn, NY). The procurement is a 100% SDVOSB set-aside under NAICS 236220, requires the SDVOSB to be SBA-verified and to perform at least 15% of the construction work, and the work must be completed within 180 calendar days from Notice to Proceed. A site visit will be held (strongly encouraged) and the contracting office requests written questions be submitted to the listed contracting POC.
Posted Date
Dec 22, 2025
Due Date
Feb 2, 2026
Release: Dec 22, 2025
Close: Feb 2, 2026
The Department of Veterans Affairs (Network Contract Office 02) issued a presolicitation for construction repairs (HVAC, roof damage and replacement of floors) at the Brooklyn VA Medical Center (800 Poly Place, Brooklyn, NY). The procurement is a 100% SDVOSB set-aside under NAICS 236220, requires the SDVOSB to be SBA-verified and to perform at least 15% of the construction work, and the work must be completed within 180 calendar days from Notice to Proceed. A site visit will be held (strongly encouraged) and the contracting office requests written questions be submitted to the listed contracting POC.
AvailableThis is a presolicitation notice for a construction project to repair HVAC and roof damage and replace floors at the VA NY Harbor Healthcare (Brooklyn VA Medical Center, 800 Poly Place, Brooklyn, NY). The procurement is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) under NAICS 236220; prospective contractors must be SBA-verified SDVOSB and registered in SAM. The solicitation is anticipated to issue around January 5, 2026, site visit details will be included in the RFQ, and questions must be submitted to the contracting officer Charlie.Augustin@va.gov.
Posted Date
Dec 22, 2025
Due Date
Feb 2, 2026
Release: Dec 22, 2025
Close: Feb 2, 2026
This is a presolicitation notice for a construction project to repair HVAC and roof damage and replace floors at the VA NY Harbor Healthcare (Brooklyn VA Medical Center, 800 Poly Place, Brooklyn, NY). The procurement is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) under NAICS 236220; prospective contractors must be SBA-verified SDVOSB and registered in SAM. The solicitation is anticipated to issue around January 5, 2026, site visit details will be included in the RFQ, and questions must be submitted to the contracting officer Charlie.Augustin@va.gov.
AvailableProfessional engineering services for the inspection and evaluation of existing locker room facilities for renovation feasibility and the elementary gymnasium roof structure for rooftop HVAC equipment additions.
Posted Date
Dec 19, 2025
Due Date
Jan 14, 2026
Release: Dec 19, 2025
Close: Jan 14, 2026
Professional engineering services for the inspection and evaluation of existing locker room facilities for renovation feasibility and the elementary gymnasium roof structure for rooftop HVAC equipment additions.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis