Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The State of South Carolina (Office of Regulatory Staff) is soliciting bids for billboard rental services (panel and digital) to support the South Carolina Equipment Distribution Program (SCEDP), requiring turn-key services including design, printing, digital file creation, and installation across rural and metropolitan areas. The solicitation lists specific billboard size requirements, pricing constraints, and an offer due date of June 29, 2026.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Upgrade existing fire alarm control panel (facp) digital alarm communication system from plain old telephone service (pots) copper landlines.
Posted Date
Jan 22, 2026
Due Date
Feb 5, 2026
Release: Jan 22, 2026
Close: Feb 5, 2026
Upgrade existing fire alarm control panel (facp) digital alarm communication system from plain old telephone service (pots) copper landlines.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Village of Round Lake, Illinois is soliciting sealed bids for the Rosewood Lift Station Remodel Improvements. Work includes remodeling the Rosewood Lift Station at 0 W. Lincoln Avenue with replacement of 5 HP pumps, pump control panel and electrical improvements, submersible level controller, wet well piping, and related items. Bid documents are available for examination at Village Hall and for download/purchase via BHFX Digital Imaging’s planroom.
Posted Date
Jan 9, 2026
Due Date
Feb 5, 2026
Release: Jan 9, 2026
Close: Feb 5, 2026
The Village of Round Lake, Illinois is soliciting sealed bids for the Rosewood Lift Station Remodel Improvements. Work includes remodeling the Rosewood Lift Station at 0 W. Lincoln Avenue with replacement of 5 HP pumps, pump control panel and electrical improvements, submersible level controller, wet well piping, and related items. Bid documents are available for examination at Village Hall and for download/purchase via BHFX Digital Imaging’s planroom.
AvailableProvision and installation of three (3) Unimac Softmount Washer-Extractor or equal: • 25lb Capacity • Single Motor Inverter with Programmable Speed Ranges. • 3.7 cu. ft. Cylinder Volume, between 350 to 400 G-Force, 1075 RPM Extraction Speed. 3.2 – Provision and installation of three (3) Unimac Single Dryer with Dual Digital Control, Reversing Cylinder, Electric Heating, White Front & Side Panels, Stainless Steel Door, Galvanized Cylinder: • Microprocessor, Black Graphics, White Front Panel, Black Door • 73,000 BTU, 500 CFM.
Posted Date
Jul 2, 2025
Due Date
Jul 8, 2028
Release: Jul 2, 2025
Close: Jul 8, 2028
Provision and installation of three (3) Unimac Softmount Washer-Extractor or equal: • 25lb Capacity • Single Motor Inverter with Programmable Speed Ranges. • 3.7 cu. ft. Cylinder Volume, between 350 to 400 G-Force, 1075 RPM Extraction Speed. 3.2 – Provision and installation of three (3) Unimac Single Dryer with Dual Digital Control, Reversing Cylinder, Electric Heating, White Front & Side Panels, Stainless Steel Door, Galvanized Cylinder: • Microprocessor, Black Graphics, White Front Panel, Black Door • 73,000 BTU, 500 CFM.
AvailableThe project consists of handling of existing wastewater flows and bypass pumping, manhole-to-manhole replacement of existing sewer main and services, installation of sewage grinder manhole, replacement of existing wet well, installation of valve vault structure, removal of existing single-phase duplex submersible pumps and associated hardware, furnishing and installation of new sewage grinder unit, furnishing and installation of new three-phase duplex submersible cutter pumps and associated hardware, installation of new submersible level transducer and digital controller with emergency back-up high level alarm float, installation of Mission alarm notification system, removal and replacement of existing control panel with a new control panel, installation of VFD to convert single-phase input power to three-phase, installation of new underground electrical conduits, removal and proper disposal of existing fence and installation of new fence, removal and proper disposal of existing liquid propane generator and fuel storage tank, installation of a new liquid propane generator and fuel storage tank, installation of new water service and yard hydrant, paving of pump station site and driveway, environmental controls, loaming and seeding, landscaping, dewatering as necessary, and all other items required to provide a completed operational sewer pump station as shown and specified in the Birch Road Sewer Pump Station Improvements contract documents, including all labor, material and equipment necessary to complete the Work.
Posted Date
Jan 22, 2026
Due Date
Feb 12, 2026
Release: Jan 22, 2026
Close: Feb 12, 2026
The project consists of handling of existing wastewater flows and bypass pumping, manhole-to-manhole replacement of existing sewer main and services, installation of sewage grinder manhole, replacement of existing wet well, installation of valve vault structure, removal of existing single-phase duplex submersible pumps and associated hardware, furnishing and installation of new sewage grinder unit, furnishing and installation of new three-phase duplex submersible cutter pumps and associated hardware, installation of new submersible level transducer and digital controller with emergency back-up high level alarm float, installation of Mission alarm notification system, removal and replacement of existing control panel with a new control panel, installation of VFD to convert single-phase input power to three-phase, installation of new underground electrical conduits, removal and proper disposal of existing fence and installation of new fence, removal and proper disposal of existing liquid propane generator and fuel storage tank, installation of a new liquid propane generator and fuel storage tank, installation of new water service and yard hydrant, paving of pump station site and driveway, environmental controls, loaming and seeding, landscaping, dewatering as necessary, and all other items required to provide a completed operational sewer pump station as shown and specified in the Birch Road Sewer Pump Station Improvements contract documents, including all labor, material and equipment necessary to complete the Work.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →