Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project scope consists of a renovation and repair to the Biggs House removing the existing paint from the exterior, repairing the existing masonry walls, and repairing and repoint all the masonry joints on the entire perimeter of the existing structure, and 2.) upon completion of all masonry repair the removal of the existing roofing material, including existing metal roofing, existing sheathing, and existing roof framing rafters, and install additional new Pressure Treated 2 x 10 roof rafters @ 24 o.c., as well as new Pressure Treated 2 x 10 ceiling joists @ 16 o.c., with new 5/8 CDX plywood sheathing installed, and covered with ice and water shield, with asphalt dimensional shingles installed over entire roof area consisting of approx. 1,440 SF.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work consists of Stedman House Interior Renovation Project.
Posted Date
Nov 20, 2025
Due Date
Jan 13, 2026
Release: Nov 20, 2025
Close: Jan 13, 2026
Work consists of Stedman House Interior Renovation Project.
AvailableProvide opera house renovation. The building is in need of strengthening to its roof trusses, a new edpm roof, replacement of the back wall, and a new egress stair tower.
Posted Date
Dec 19, 2025
Due Date
Feb 4, 2026
Release: Dec 19, 2025
Close: Feb 4, 2026
Provide opera house renovation. The building is in need of strengthening to its roof trusses, a new edpm roof, replacement of the back wall, and a new egress stair tower.
AvailableProject consists of renovation/remodel/repair. See outside link.
Posted Date
-
Due Date
Feb 5, 2026
Close: Feb 5, 2026
Project consists of renovation/remodel/repair. See outside link.
AvailableProject consists of new construction. See outside link.
Posted Date
-
Due Date
Feb 5, 2026
Close: Feb 5, 2026
Project consists of new construction. See outside link.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis