Ventura College Library and Learning Resource Roof Repairs Project "Re-Bid" RFP
College library and learning resource roof repairs project.
Description: Project Summary: This scope of work is a summary, it is not all-inclusive, nor is intended to limit work described in the construction documents. This project scope includes all site preparation, facility, equipment, and personnel protection measures, and associated building improvements to repair the roof, walls, terrace tile flooring, and repairs and refinishing of the interior walls and surfaces from moisture penetrations/damages. Scope of work includes demolishing and damaged Kalwall translucent paneling systems in various locations throughout the building -- walls and roofing, demo and disposal, repair and repainting of interior wall finish to facilitate removal and replacement of Kalwall systems, demo -- disposal -- and replacement of floor tiling, demo and replacement of TPO roofing system as indicated in the construction documents. Project Estimate: $750,000
HigherEducation · CA, US
Adjacent opportunities open for bidding right now.
Ventura County Community College System Office
Higher EducationCA
Posted
Mar 6, 2026
Dec 9, 2026
College library and learning resource roof repairs project.
CityMI
Posted
Nov 17, 2026
Dec 17, 2026
The City of Three Rivers is soliciting sealed bids for municipal roof and structural repair work on city-owned buildings. Bidders must submit sealed proposals to the Office of the City Clerk by the stated deadline and may obtain bid documents and specifications from the City website, the Department of Public Services, or by phone. The solicitation notes the City’s reservation of rights to reject or waive bids and references a local preference guideline and nondiscrimination statement.
CityTN
Posted
Nov 18, 2026
Dec 10, 2026
The City of Cookeville is procuring removal, repair, placement and/or replacement of guardrails throughout Cookeville, Tennessee. Work includes removal and installation of guardrail systems, guardrail posts, anchors and anchor pads and furnishing all labor, equipment and materials necessary to provide safe and compliant guardrails. The contract requires bidders to supply all components and perform work to ensure installed guardrails meet applicable standards and specifications.
CityIA
Posted
Nov 7, 2025
Dec 8, 2026
Work includes: grinding of brush and logs collected over the past year at the city's yard waste site. Grind or shred accumulated brush into chips no larger than 3" in size. Complete grinding of accumulated brush pile by March 1, 2027.
Decision makers connected to this RFP from Ventura College.
From the first pre-RFP signals to the published RFP and its files.
Board meeting
547 days before RFP
The 2025-26 tentative Infrastructure Fund budget lists $1,225,000 for scheduled maintenance and instructional furniture and identifies building maintenance as an Infrastructure Fund use.
Ventura College Infrastructure Fund Budget Beginning Fund Balance Budgeted Expenditures Budgeted Ending Fund Balance Scheduled Maintenance & Instructional Furniture $3,693,943 $1,225,000 $2,468,943 Library Books & Databases $410,768 $150,000 $260,768 Instructional & Non-Instructional Equipment $722,964 $350,000 $372,964 Tech Hardware & Software $2,239,249…
Ventura College Budget Workshop
Board meeting · May 8, 2025
RFP published