Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This RFP is for the installation of concrete sidewalks and extruded concrete curbing.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes 50 CY of unclassified excavation, 10 CY of structure excavation, 8000 SF of remove existing concrete, bituminous or slate walk & aprons, 200 LF of remove existing curb, 6000 SF of 4" concrete sidewalk, 2000 SF of 5" concrete sidewalk, 800 SF of 5" concrete handicap ramps, 4000 SF of concrete sidewalks and aprons at driveways, 50 SF of concrete steps, 50 LF of reset slate walks, 100 LF of reset stone curbing, 300 LF of concrete curbing, 2500 SF of area restoration, 100 LF of saw cut concrete, 500 LF of saw cut bituminous, 20 LF of drains and under drains, 2 EA of stump removal (6-12"), 2 EA of stump removal (12"-24"), 2 EA of stump removal (over 24"). See attached file.
Posted Date
Jan 8, 2026
Due Date
Jan 27, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Jan 27, 2026
Work includes 50 CY of unclassified excavation, 10 CY of structure excavation, 8000 SF of remove existing concrete, bituminous or slate walk & aprons, 200 LF of remove existing curb, 6000 SF of 4" concrete sidewalk, 2000 SF of 5" concrete sidewalk, 800 SF of 5" concrete handicap ramps, 4000 SF of concrete sidewalks and aprons at driveways, 50 SF of concrete steps, 50 LF of reset slate walks, 100 LF of reset stone curbing, 300 LF of concrete curbing, 2500 SF of area restoration, 100 LF of saw cut concrete, 500 LF of saw cut bituminous, 20 LF of drains and under drains, 2 EA of stump removal (6-12"), 2 EA of stump removal (12"-24"), 2 EA of stump removal (over 24"). See attached file.
AvailableConstruct nine new ADA ramps, form and pour 847 SY new concrete walks, and construct one 154 SF median crossing island includes 11 CY general excavation, 500 SF crushed stone path, 137 LF concrete curb type A, 873 SF monolithic curb and sidewalks, 9 SF extra for new curb ramps, 400 EA longitudinal pavement markings - paint, 39 SF signs, standard sheeting, extruded aluminum.
Posted Date
Jan 12, 2026
Due Date
Feb 11, 2026
Release: Jan 12, 2026
Close: Feb 11, 2026
Construct nine new ADA ramps, form and pour 847 SY new concrete walks, and construct one 154 SF median crossing island includes 11 CY general excavation, 500 SF crushed stone path, 137 LF concrete curb type A, 873 SF monolithic curb and sidewalks, 9 SF extra for new curb ramps, 400 EA longitudinal pavement markings - paint, 39 SF signs, standard sheeting, extruded aluminum.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →