This project involves milling and overlaying the existing bituminous pavement of Taxiways A, C, & D, reconstruction of bituminous taxiway connection, and reapplying pavement markings. Major items of work are as follows: Contractor Quality Control Program (CQCP) 1 LS Installation, Maintenance, & Removal of Earthen Berm 1,712 LF Storm Drain Inlet Protection 6 EA Sediment Control Log, Type Rock 540 LF Mobilization 1 LS Dozer 20 HOUR Water-Dust Control 100 MGAL Inspection Hole 10 LF Traffic Control 1 LS Engineer/RPR Field Office 1 LS Temporary Fence 11,315 LF Stabilized Construction Exit 2 EA Pavement Removal 12,408 SY Cold Milling 37,476 SY Unclassified Excavation 9,510 CY Subbase Course 1,686 CY Crushed Aggregate Base Course 2,257 SY Asphalt Surface Course 6,095 TON Asphalt Base Course 7,705 TON Emulsified Asphalt Tack Coat 8,140 GAL Surface Preparation 7,692 SF Marking, Reflectorized (White) 765 SF Marking, Reflectorized (Yellow) 6,329SF Marking, Reflectorized (Red) 600 SF Temporary Marking (White) 765 SF Temporary Marking (Yellow) 6,329 SF Temporary Marking (Red) 600 SF Seeding 11.38 AC Topsoil 6,125 CY Mulching 11.38 AC Demolish Existing Airfield Lighting 1 LS Temporary Airport Lighting Systems 1 LS No. 8 AWG, 5kV, L-824, Type C Cable, Installed in Duct Bank or Conduit 2,860 LF No. 6 AWG, Solid, Bare Copper Counterpoise Wire, Installed Above the Duct Bank or Conduit, Including Ground Rods and Connections/Terminations 1,710 LF 1-Way, 2” Schedule 40 PVC, Direct Buried Electrical Conduit 2,220 LF 2-Way, 2” Schedule 40 PVC, Concrete Encased Electrical Conduit 90 LF L-867D, Junction Can 2 EA L-861T Taxiway Edge Light, With L-867 Base Can 30 EA Reinstall Guidance Sign, Size 2, 2-Module on New Concrete Foundation 1 EA Replace Existing Guidance Sign Panel, Size 2, Style 2 38 EA Guidance Sign, Size 2, 2-Module on Extended Concrete Foundation 5 EA Electrical Allowance 1 LS