72,571 SY Hot Mix Asphalt, Milling, 3" or less; 915 CY Roadway Excavation, Unclassified; 9,686 tons Hot Mix Asphalt, Surface Course, 9.5M64; 1,055 tons Hot Mix Asphalt, Base Course, 19M64; 1,320 SY D.G.A.B.C, 6" Thick; 96 units Reset Manhole Casting; 2,455 LF of 6"x 9"x 20" Concrete Vertical Curb; 750 LF Concrete Curb and Gutter;3,200 LF Mountable Concrete Curb; 830 SY Concrete Sidewalk, 4" Thick; 51 SY Detectable Warning Surface; 405 SY Hot Mix Asphalt Driveway, 5" Thick; 285 SY Concrete Driveway, Reinforced, 6" Thick; 6,390 LF Underdrain Type "F" Modified; 969 LF Traffic Markings Lines, 4" Wide; 691 LF Traffic Markings Lines, 6" Wide; 2,345 SYFertilizer, Topsoil, Seed & Mulch; 550 SY Trench Restoration; 1,120 LF of 8" Ductile Iron Pipe, Class 52; 2,248 LF of 1" Type "K" Copper Service; 104 units Curb Box & Service Connection. Also included in this proposal are four (4) alternate bids: Alternate #1 – Park Parking Lot Surface Course: 2,410 SY Hot Mix Asphalt, Transition Milling & Scarification; 400 tons Hot Mix Asphalt, Surface Course, 9.5M64; 155 LF of 6"x 9"x 20" Concrete Vertical Curb; 1,840 LF Traffic Markings Lines, 4" Wide; 15 LF Traffic Markings Lines, 24" Wide; 110 SF Traffic Markings Symbols. Alternate #2 – Park Parking Lot Concrete Work: 375 SY Concrete Sidewalk, 4" Thick; 5 SY Detectable Warning Surface; 200 SY Fertilizer, Topsoil, Seed & Mulch. Alternate #3 – Police Parking Lot Resurfacing: 5,500 SY Hot Mix Asphalt, Milling, 3" or less; 35 CY Roadway Excavation, Unclassified; 100 SY Hot Mix Asphalt, Surface Course, 12.5M64 (700 Tons), D.G.A.B.C., 6" Thick; 4,795 LF Traffic Markings Liners, 4" Wide; 70 LF Traffic Markings Liners, 24" Wide; 2,500 SF Traffic Markings Symbols; 20 SY Fertilizer, Topsoil, Seed & Mulch. Alternate #4 – Avenue Curb Replacement: 1,680 LF of 6"x 9"x 20" Concrete Vertical Curb; 30 SY Concrete Sidewalk, 4" Thick; 2 SY Detectable Warning Surface; 45 SY Hot Mix Asphalt Driveway, 5" Thick; 125 CY Roadway Excavation, Unclassified; 375 SY D.G.A.B.C., 6" Thick; 95 tons Hot Mix Asphalt, Base Course, 19M64; 50 tons Hot Mix Asphalt, Surface Course, 9.5M64; 550 SY Fertilizer, Topsoil, Seed & Mulch.