Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project includes the following work: the complete demolition and replacement of the existing lift station.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The Village of Schaumburg is soliciting sealed bids to completely reconstruct the sanitary lift station at 1151 N Walnut Lane, including demolition of the existing station and construction of a prefabricated wet well lift station. Bids must be submitted electronically through the Village’s OpenGov e-Procurement portal and will be received until February 6, 2026. The project also includes the installation of an external gas generator and is scheduled to begin construction in spring 2026.
Posted Date
Jan 22, 2026
Due Date
Feb 6, 2026
Release: Jan 22, 2026
Close: Feb 6, 2026
The Village of Schaumburg is soliciting sealed bids to completely reconstruct the sanitary lift station at 1151 N Walnut Lane, including demolition of the existing station and construction of a prefabricated wet well lift station. Bids must be submitted electronically through the Village’s OpenGov e-Procurement portal and will be received until February 6, 2026. The project also includes the installation of an external gas generator and is scheduled to begin construction in spring 2026.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work related to the stormwater pump station includes installing new stormwater pumps, influent manholes, wetwell, additional manholes, platform, gravity storm drain, outfall, and other site improvements and civil work. Work related to the wastewater pump station includes installing new wastewater pumps, influent manhole, wetwell, valve vault, flow meter vault, new force main and other site improvements and civil work. It is anticipated stormwater pump station work to occur first and the wastewater pump station to follow
Posted Date
Dec 18, 2025
Due Date
Feb 2, 2026
Release: Dec 18, 2025
Close: Feb 2, 2026
Work related to the stormwater pump station includes installing new stormwater pumps, influent manholes, wetwell, additional manholes, platform, gravity storm drain, outfall, and other site improvements and civil work. Work related to the wastewater pump station includes installing new wastewater pumps, influent manhole, wetwell, valve vault, flow meter vault, new force main and other site improvements and civil work. It is anticipated stormwater pump station work to occur first and the wastewater pump station to follow
AvailableWork includes 1 LS temporary bypass system; 1 LS erosion and sediment control; LS demolition; 1 LS wet well; 1 LS concrete building foundation and slab; 1 LS relief storage concrete work; 2 EA sanitary manholes, 4' diameter; 1 LS concrete generator pad; 1 EA pig launching structure; 1 LS relief storage access hatches and vents; 1 LS prefabricated pump station building complete; 1 LS process piping and appurtenances; 1 LS process valves and appurtenances; 1 LS submersible solids handling pumps and appurtenances; 1 LS electric wires and cables. See attached file.
Posted Date
Jan 22, 2026
Due Date
Feb 6, 2026
Release: Jan 22, 2026
Close: Feb 6, 2026
Work includes 1 LS temporary bypass system; 1 LS erosion and sediment control; LS demolition; 1 LS wet well; 1 LS concrete building foundation and slab; 1 LS relief storage concrete work; 2 EA sanitary manholes, 4' diameter; 1 LS concrete generator pad; 1 EA pig launching structure; 1 LS relief storage access hatches and vents; 1 LS prefabricated pump station building complete; 1 LS process piping and appurtenances; 1 LS process valves and appurtenances; 1 LS submersible solids handling pumps and appurtenances; 1 LS electric wires and cables. See attached file.
AvailableWork includes construction of a new stormwater pump station to replace the existing wetwell within the pump station, installing a new wetwell with submersible pumps and a controls building, new trash rack, piles, along with mechanical, electrical, and civil work, including installation of owner supplied equipment.
Posted Date
Jan 8, 2026
Due Date
Jan 29, 2026
Release: Jan 8, 2026
Close: Jan 29, 2026
Work includes construction of a new stormwater pump station to replace the existing wetwell within the pump station, installing a new wetwell with submersible pumps and a controls building, new trash rack, piles, along with mechanical, electrical, and civil work, including installation of owner supplied equipment.