Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consists of Switching Station. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
115 kV Control enclosure Getchell switching station.
Posted Date
Dec 17, 2025
Due Date
Jan 21, 2026
Release: Dec 17, 2025
Close: Jan 21, 2026
115 kV Control enclosure Getchell switching station.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide 56MVA, 13.8/72.49 kV GSU transformer for Olive A3 switching station.
Posted Date
Oct 29, 2025
Due Date
Jan 19, 2026
Release: Oct 29, 2025
Close: Jan 19, 2026
Provide 56MVA, 13.8/72.49 kV GSU transformer for Olive A3 switching station.
AvailableThe U.S. Department of Energy (Western Area Power Administration, Western Upper Great Plains Region) issued a construction solicitation for the Philip North Switching Station Stage 01 in Philip, South Dakota, covering civil, electrical, and station equipment installation. The work includes site preparation, concrete foundations, steel structures, fencing, installation of government-furnished breakers, transformers, communication equipment, fiber, and associated electrical and control systems with a period of performance of 360 calendar days. The solicitation was posted in early January 2026 and is a Small Business set-aside with a response deadline of February 6, 2026.
Posted Date
Jan 7, 2026
Due Date
Feb 6, 2026
Release: Jan 7, 2026
Close: Feb 6, 2026
The U.S. Department of Energy (Western Area Power Administration, Western Upper Great Plains Region) issued a construction solicitation for the Philip North Switching Station Stage 01 in Philip, South Dakota, covering civil, electrical, and station equipment installation. The work includes site preparation, concrete foundations, steel structures, fencing, installation of government-furnished breakers, transformers, communication equipment, fiber, and associated electrical and control systems with a period of performance of 360 calendar days. The solicitation was posted in early January 2026 and is a Small Business set-aside with a response deadline of February 6, 2026.
AvailableContractor to provide all labor, materials, equipment, transportation and other resources to complete the construction of switching station, stage 01. The principal components of the work involve miscellaneous sitework, demolition, earthwork, chain link fence, gravel surfacing, riprap, and seeding; providing concrete foundations; providing steel structures; installing Government-Furnished equipment including power circuit breakers, disconnecting switches, coupling capactor voltage transformers, surge arrester, voltage transformers, and control cable,; providing station battery sytems, switchboard sections, high voltage bus, grounding, conduit, cable trench, distribution panels, miscellaneous electrical, communication facilities, fiber optic cables and equipment, and constructing a site-built contol builing complete with electrical and mechanical systems.
Posted Date
Dec 22, 2025
Due Date
Feb 7, 2026
Release: Dec 22, 2025
Close: Feb 7, 2026
Contractor to provide all labor, materials, equipment, transportation and other resources to complete the construction of switching station, stage 01. The principal components of the work involve miscellaneous sitework, demolition, earthwork, chain link fence, gravel surfacing, riprap, and seeding; providing concrete foundations; providing steel structures; installing Government-Furnished equipment including power circuit breakers, disconnecting switches, coupling capactor voltage transformers, surge arrester, voltage transformers, and control cable,; providing station battery sytems, switchboard sections, high voltage bus, grounding, conduit, cable trench, distribution panels, miscellaneous electrical, communication facilities, fiber optic cables and equipment, and constructing a site-built contol builing complete with electrical and mechanical systems.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →