Summary
Work includes 1 LS Mobilization, Site Preparation, Erosion Control and Final Clean Up; 170 SY of Remove and Dispose Flexible Pavement; 50 LF of Remove and Reset Cement Concrete Curb; 3 EA Installation of 4' Dia. Sewer Manhole; 3 EA Installation of Sewer Manhole Frame and Cover; 25 Ton 2" Temp Bituminous Patch; 20 Ton 1-1/2" Bituminous Surface Course; 25 Ton 2" Bituminous Binder Course; 250 LF of 8" PVC Sewer Main including Trench Excavation; 140 LF of 6" PVC Sewer Laterals including Trench Excavation; 16 EA 6" Inline Backwater Valve and Cleanout Assembly; 60 CY of Trench Rock Excavation. See attached file.