Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 525 LF of 2" SDR-26 PVC water main; 400 LF of 3" SDR-26 PVC water main, 48,240 4" SDR-26 PVC water main; 120 LF of 8" HDPE cased bore; 480 LF of 10" HDPE cased bore; 1,855 LF of 4" HDPE direction bore; 38 EA of service line roadway bore; 500 LF of silt fence; 6,755 LF of 4" SDR-26 PVC water main; see outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Contract #1: Water Distribution System Upgrades that consist of approximately 6,100 LF of 8” PVC, 13,050 LF of 6” PVC, 2,190 LF of 4” PVC, and 2,100 LF of 2” PVC Waterline. The project will also consist of approximately 3,100 LF of various sized customer service line ranging from ¾” to 1-1/2”. Approximately 210 customers will be reconnected, 45 EA Gate Valves ranging in size from 2” to 8” will be installed, 14 EA Fire Hydrants will be installed and all related appurtenances to complete the project. See outside link.
Posted Date
Oct 16, 2025
Due Date
Jan 27, 2026
Release: Oct 16, 2025
Close: Jan 27, 2026
Contract #1: Water Distribution System Upgrades that consist of approximately 6,100 LF of 8” PVC, 13,050 LF of 6” PVC, 2,190 LF of 4” PVC, and 2,100 LF of 2” PVC Waterline. The project will also consist of approximately 3,100 LF of various sized customer service line ranging from ¾” to 1-1/2”. Approximately 210 customers will be reconnected, 45 EA Gate Valves ranging in size from 2” to 8” will be installed, 14 EA Fire Hydrants will be installed and all related appurtenances to complete the project. See outside link.
AvailableWork consists of: removal of existing water treatment equipment and installation of new water treatment equipment at four buildings including piping additions, yard piping and surface restoration.
Posted Date
Nov 7, 2025
Due Date
Feb 3, 2026
Release: Nov 7, 2025
Close: Feb 3, 2026
Work consists of: removal of existing water treatment equipment and installation of new water treatment equipment at four buildings including piping additions, yard piping and surface restoration.
AvailableThe City of Pearson, Georgia is requesting bids for Water System Improvements.
Posted Date
Jan 15, 2026
Due Date
Feb 19, 2026
Release: Jan 15, 2026
Close: Feb 19, 2026
The City of Pearson, Georgia is requesting bids for Water System Improvements.
AvailableMarco Rural Water Company is soliciting bids for Contract 6 at the Brittons Neck Water Treatment Facility to construct a new reverse osmosis system, evaporation pad, finish water tank, and associated appurtenances. Bids are due January 27, 2026 at 2:00 PM local time; bidding documents are available from Hanna Engineering (Issuing Office) and via the project details link on the official posting. The project is funded in whole or in part through the South Carolina Infrastructure Investment Program (SCIIP) but is a construction procurement (contract), not a grant program.
Posted Date
Dec 19, 2025
Due Date
Jan 27, 2026
Release: Dec 19, 2025
Close: Jan 27, 2026
Marco Rural Water Company is soliciting bids for Contract 6 at the Brittons Neck Water Treatment Facility to construct a new reverse osmosis system, evaporation pad, finish water tank, and associated appurtenances. Bids are due January 27, 2026 at 2:00 PM local time; bidding documents are available from Hanna Engineering (Issuing Office) and via the project details link on the official posting. The project is funded in whole or in part through the South Carolina Infrastructure Investment Program (SCIIP) but is a construction procurement (contract), not a grant program.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.