Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project involves the installation of a new storm sewer system in, along, and adjacent to beams run road in the borough including, the installation of storm sewer manholes; slcpp wt jt storm sewer; installation of endwall with rip rap apron; connection to existing structures; grouting of existing storm sewer; site preparation; unclassified bulk and trench excavation; erosion and sedimentation control measures; associated site restoration; traffic control; utility coordination, location, support, and notification; resident notifications and all other incidental items, complete in place.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Underground stormwater facility maintenance, inspection and repair.
Posted Date
Jan 6, 2026
Due Date
Jan 28, 2026
Release: Jan 6, 2026
Close: Jan 28, 2026
Underground stormwater facility maintenance, inspection and repair.
AvailableRepair underground stormwater sewage system.
Posted Date
Jan 12, 2026
Due Date
Jan 27, 2026
Release: Jan 12, 2026
Close: Jan 27, 2026
Repair underground stormwater sewage system.
AvailableThis project involves Replacement of the existing bridge carrying Donat Road over Stoney Run, installation of a temporary crossing and other miscellaneous construction.
Posted Date
Jul 21, 2025
Due Date
Jan 29, 2026
Release: Jul 21, 2025
Close: Jan 29, 2026
This project involves Replacement of the existing bridge carrying Donat Road over Stoney Run, installation of a temporary crossing and other miscellaneous construction.
AvailableSeeking qualified construction contractors to provide on-call emergency and repair services for water distribution, sanitary sewer, and stormwater drainage systems.
Posted Date
-
Due Date
Feb 6, 2026
Close: Feb 6, 2026
Seeking qualified construction contractors to provide on-call emergency and repair services for water distribution, sanitary sewer, and stormwater drainage systems.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis