Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Replace HMI/PL controls on switchgear lineup with Woodard EasyGen 3500XT-P2 controller and perform system operational checkout after installation for 3 systems. Generator 2: (controls Administration, Central, and Unit 21). Generator 4: (controls Unit 24, Unit 25, and Support I). Generator 6: (controls the Women’s Facility, Kitchen, P, Q, and 28).
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Remove and dispose of all existing relays. Empty and dispose of all items inside the cubicle. (the only items remaining will be the existing low voltage (lv) circuit breakers. ) panels and wiring are to be fabricated by vendor (unless otherwise specified). Vendor to perform field wiring. Vendor to install human-machine interface (hmi) control panels for both units. Programmable logic controller (plc) programming to monitor input from sensors, process data, and control outputs. Vendor to provide system control circuit design. Provide 2000kw generator with auto transfer switch or equivalent to cover any planned interruptions to minimize impact to facility operations.
Posted Date
Dec 1, 2025
Due Date
Jan 13, 2026
Release: Dec 1, 2025
Close: Jan 13, 2026
Remove and dispose of all existing relays. Empty and dispose of all items inside the cubicle. (the only items remaining will be the existing low voltage (lv) circuit breakers. ) panels and wiring are to be fabricated by vendor (unless otherwise specified). Vendor to perform field wiring. Vendor to install human-machine interface (hmi) control panels for both units. Programmable logic controller (plc) programming to monitor input from sensors, process data, and control outputs. Vendor to provide system control circuit design. Provide 2000kw generator with auto transfer switch or equivalent to cover any planned interruptions to minimize impact to facility operations.
AvailableThis project replaces obsolete 400 KW exterior diesel generator and 800 A interior automatic transfer switch. Generator and automatic transfer switch will be furnished by User Agency and installed by Contractor.
Posted Date
Dec 16, 2025
Due Date
Jan 27, 2026
Release: Dec 16, 2025
Close: Jan 27, 2026
This project replaces obsolete 400 KW exterior diesel generator and 800 A interior automatic transfer switch. Generator and automatic transfer switch will be furnished by User Agency and installed by Contractor.
AvailableWork includes : installation of new natural gas generator and transfer switch and associated electrical and mechanical work.
Posted Date
Dec 19, 2025
Due Date
Feb 12, 2026
Release: Dec 19, 2025
Close: Feb 12, 2026
Work includes : installation of new natural gas generator and transfer switch and associated electrical and mechanical work.
AvailableWork includes installation of a diesel generator and automatic transfer switch. Set and secure generator on the prepared concrete pad. Install all required control cables, main power cables, and two dedicated circuits for the battery charger and block heater. Automatic transfer switch (ATS) o ASCO 300 series or equal.
Posted Date
Jan 5, 2026
Due Date
Jan 27, 2026
Release: Jan 5, 2026
Close: Jan 27, 2026
Work includes installation of a diesel generator and automatic transfer switch. Set and secure generator on the prepared concrete pad. Install all required control cables, main power cables, and two dedicated circuits for the battery charger and block heater. Automatic transfer switch (ATS) o ASCO 300 series or equal.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis