Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project includes the retrofitting of a lake into a Level 2 Pond. This will include the construction of two pretreatment forebays at the north and south inlets. The forebays will need to be accessible 20 LF of reinforced turf path. This project will also include the construction of a wetland cell at the outlet of the northern forebay and aquatic benching established along the eastern side of the lake with both having coir fiber logs to aid in erosion stabilization. Two pond aerators will be installed in the north and south of the existing lake. Through these additions, utilities, fences, and trees will be removed in select locations. Vegetation will be maintained when it is healthy and native. The work will also include dredging and removal of material from the existing pond. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Project consists of water main improvement. See outside link.
Posted Date
Jun 27, 2025
Due Date
Dec 12, 2025
Release: Jun 27, 2025
Close: Dec 12, 2025
Project consists of water main improvement. See outside link.
Premium
Access the largest public sector contact database
Work includes approx. to inspect, evaluate and provide conceptual design alternative for the existing trail and seawall surrounding Pier Park Lake and inspect, evaluate and recommend improvements to the water quality of Pier Park Lake. See the outside links for more details.
Posted Date
Nov 21, 2025
Due Date
Dec 16, 2025
Release: Nov 21, 2025
Close: Dec 16, 2025
Work includes approx. to inspect, evaluate and provide conceptual design alternative for the existing trail and seawall surrounding Pier Park Lake and inspect, evaluate and recommend improvements to the water quality of Pier Park Lake. See the outside links for more details.
AvailableRelease: Nov 2, 2025
Close: Dec 16, 2025
Project consist of drainage improvement.
AvailableRelease: Nov 26, 2025
Close: Dec 30, 2025
Road improvement project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis