Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Solicitation for general and heavy construction of the Battery E activated sludge facility at the Terrance J. O'Brien Water Reclamation Plant, including cast-in-place concrete conduits, tunnels, mixing chamber, fermenter, anoxic and aeration tanks, final settling tanks, operating gallery building, piping, mechanical equipment (mixers, pumps, air diffusers, flow meters, gates), electrical/instrumentation & controls, HVAC, and site civil/utility work. Estimated contract value $308,754,750–$373,755,750; required bid bond $3,737,557; MBE/WBE/VBE goals 20%/10%/3%.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes : construction of the 8'-0" x 8'-0" cast in place concrete battery e influent conduit, extending from the north side of the existing meter building to the new battery e mixing chamber, and including a new motorized knife gate valve and magnetic flow meter.
Posted Date
Sep 9, 2025
Due Date
Jan 27, 2026
Release: Sep 9, 2025
Close: Jan 27, 2026
Work includes : construction of the 8'-0" x 8'-0" cast in place concrete battery e influent conduit, extending from the north side of the existing meter building to the new battery e mixing chamber, and including a new motorized knife gate valve and magnetic flow meter.
AvailableThe City of Bullhead City is soliciting bids for construction improvements at the Section 10 Water Reclamation Plant, specifically for Clarifier 3 and RAS/WAS pump station upgrades. This project involves constructing a third clarifier, adding a new RAS/WAS pump, replacing two existing pumps, and includes various civil and SCADA upgrades. The estimated project cost ranges from $1,000,000 to $5,000,000 with a 180-day duration.
Posted Date
Dec 10, 2025
Due Date
Jan 14, 2026
Release: Dec 10, 2025
Close: Jan 14, 2026
The City of Bullhead City is soliciting bids for construction improvements at the Section 10 Water Reclamation Plant, specifically for Clarifier 3 and RAS/WAS pump station upgrades. This project involves constructing a third clarifier, adding a new RAS/WAS pump, replacing two existing pumps, and includes various civil and SCADA upgrades. The estimated project cost ranges from $1,000,000 to $5,000,000 with a 180-day duration.
Provide sludge removal and disposal services, including licenses, permitting, labor, equipment, parts, materials, testing or other incidental work for the removal of accumulated solids from a water treatment plant sludge lagoon.
Posted Date
Nov 19, 2025
Due Date
Dec 18, 2025
Release: Nov 19, 2025
Close: Dec 18, 2025
Provide sludge removal and disposal services, including licenses, permitting, labor, equipment, parts, materials, testing or other incidental work for the removal of accumulated solids from a water treatment plant sludge lagoon.
AvailableThe Town of Erie is soliciting design services for improvements to the North Water Reclamation Facility, including construction of sampling and flow measurement structures, road construction, telemetry, new pumps, HVAC and blower upgrades, and a second mechanical bar screen. The consultant will provide preliminary and final design, bidding phase, and construction phase services and must comply with applicable environmental regulations.
Posted Date
-
Due Date
Dec 20, 2025
Close: Dec 20, 2025
The Town of Erie is soliciting design services for improvements to the North Water Reclamation Facility, including construction of sampling and flow measurement structures, road construction, telemetry, new pumps, HVAC and blower upgrades, and a second mechanical bar screen. The consultant will provide preliminary and final design, bidding phase, and construction phase services and must comply with applicable environmental regulations.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis