Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Competitive sealed proposals to perform construction upgrades at Barron Elementary (Plano, TX): replacement of select RTUs, comprehensive HVAC controls system renovation, marquee replacement, and related compliance/site work. Estimated budget $750,000 plus $50,000 owner contingency. Two-part submission required (electronic via IonWave and sealed hard-copy), 5% bid bond required, plus performance/payment bonds, insurance, contractor qualifications, and standard public-school contract compliance forms.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Plano ISD solicits competitive sealed proposals for construction/renovation at Thomas Elementary School (Plano, TX), including HVAC upgrades (select RTU replacements, HVAC controls renovation), replacement of one boiler with two new boilers, fire alarm system replacement, sprinkler valve replacement, marquee replacement, full restroom renovations, and three alternates for chiller/primary/secondary pump work. Estimated construction budget ~$2.4M (plus owner/construction contingencies and allowances). Procurement requires a two-part submission (electronic via Ionwave plus hard-copy sealed proposal), 5% bid bond, required performance/payment bonds and specified insurance, contractor qualification documentation (AIA A305), and other compliance forms; mandatory pre-bid/site visit and virtual proposal opening. Contact: Veronica Couzynse (veronica.couzynse@pisd.edu).
Posted Date
Dec 5, 2025
Due Date
Jan 6, 2026
Release: Dec 5, 2025
Close: Jan 6, 2026
Plano ISD solicits competitive sealed proposals for construction/renovation at Thomas Elementary School (Plano, TX), including HVAC upgrades (select RTU replacements, HVAC controls renovation), replacement of one boiler with two new boilers, fire alarm system replacement, sprinkler valve replacement, marquee replacement, full restroom renovations, and three alternates for chiller/primary/secondary pump work. Estimated construction budget ~$2.4M (plus owner/construction contingencies and allowances). Procurement requires a two-part submission (electronic via Ionwave plus hard-copy sealed proposal), 5% bid bond, required performance/payment bonds and specified insurance, contractor qualification documentation (AIA A305), and other compliance forms; mandatory pre-bid/site visit and virtual proposal opening. Contact: Veronica Couzynse (veronica.couzynse@pisd.edu).
AvailableElementary school playground project.
Posted Date
Dec 3, 2025
Due Date
Jan 5, 2026
Release: Dec 3, 2025
Close: Jan 5, 2026
Elementary school playground project.
AvailableFrench Creek Elementary School Site Improvements Project.
Posted Date
Nov 17, 2025
Due Date
Jan 5, 2026
Release: Nov 17, 2025
Close: Jan 5, 2026
French Creek Elementary School Site Improvements Project.
AvailableSan Francisco Unified School District (Project No. 11989) requests bids for the El Dorado Elementary School Green Infrastructure Project, including asphalt removal, stormwater capture systems, and the introduction of native vegetation. Bids are due December 12, 2025 at 2:00 PM local time; the estimated construction cost is $1,500,000 and a Class B General Contractor (or subcontractor with asbestos and lead certification) is required.
Posted Date
Nov 10, 2025
Due Date
Dec 12, 2025
Release: Nov 10, 2025
Close: Dec 12, 2025
San Francisco Unified School District (Project No. 11989) requests bids for the El Dorado Elementary School Green Infrastructure Project, including asphalt removal, stormwater capture systems, and the introduction of native vegetation. Bids are due December 12, 2025 at 2:00 PM local time; the estimated construction cost is $1,500,000 and a Class B General Contractor (or subcontractor with asbestos and lead certification) is required.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis