Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Base Bid: Improvements include clearing and grubbing of vegetation, channel grading, channel stabilization application including tied concrete block mat and rip rap, temporary erosion control, and permanent seeding.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
OWASA requests qualifications for professional engineering services to design and permit bank stabilization and potential dredging of the Morgan Creek bypass channel at Mason Farm WWTP. Required work includes hydraulic analysis, floodplain/floodway modeling, erosion assessment, stabilization design, evaluation and design for dredging, permitting (federal/state/local), bid assistance, and construction-phase monitoring. Qualification-based selection; firms must demonstrate experience with channel hydraulic modeling, channel stabilization methods, dredging, and permitting. Submittal: email PDF, letter-size, qualifications limited to 6 pages.
Posted Date
Dec 5, 2025
Due Date
Jan 13, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Jan 13, 2026
OWASA requests qualifications for professional engineering services to design and permit bank stabilization and potential dredging of the Morgan Creek bypass channel at Mason Farm WWTP. Required work includes hydraulic analysis, floodplain/floodway modeling, erosion assessment, stabilization design, evaluation and design for dredging, permitting (federal/state/local), bid assistance, and construction-phase monitoring. Qualification-based selection; firms must demonstrate experience with channel hydraulic modeling, channel stabilization methods, dredging, and permitting. Submittal: email PDF, letter-size, qualifications limited to 6 pages.
AvailableOWASA requests qualifications for professional engineering services to design and permit bank stabilization and potential dredging of the Morgan Creek bypass channel at Mason Farm WWTP. Required work includes hydraulic analysis, floodplain/floodway modeling, erosion assessment, stabilization design, evaluation and design for dredging, permitting (federal/state/local), bid assistance, and construction-phase monitoring. Qualification-based selection; firms must demonstrate experience with channel hydraulic modeling, channel stabilization methods, dredging, and permitting. Submittal: email PDF, letter-size, qualifications limited to 6 pages.
Posted Date
Dec 5, 2025
Due Date
Jan 13, 2026
Release: Dec 5, 2025
Close: Jan 13, 2026
OWASA requests qualifications for professional engineering services to design and permit bank stabilization and potential dredging of the Morgan Creek bypass channel at Mason Farm WWTP. Required work includes hydraulic analysis, floodplain/floodway modeling, erosion assessment, stabilization design, evaluation and design for dredging, permitting (federal/state/local), bid assistance, and construction-phase monitoring. Qualification-based selection; firms must demonstrate experience with channel hydraulic modeling, channel stabilization methods, dredging, and permitting. Submittal: email PDF, letter-size, qualifications limited to 6 pages.
AvailableWork includes repair concrete trapezoidal channel invert and a concrete rectangular channel side wall and bracing of splitter wall.
Posted Date
Dec 6, 2025
Due Date
Jan 13, 2026
Release: Dec 6, 2025
Close: Jan 13, 2026
Work includes repair concrete trapezoidal channel invert and a concrete rectangular channel side wall and bracing of splitter wall.
AvailableAccepting sealed bids for shoreline stabilization. Shoreline stabilization would include the use of rip rap along approx 525ft of shoreline with approx 325 tons of rip rap. Shoreline stabilization (rip rap) shall be installed by boat.
Posted Date
Nov 10, 2025
Due Date
Jan 8, 2026
Release: Nov 10, 2025
Close: Jan 8, 2026
Accepting sealed bids for shoreline stabilization. Shoreline stabilization would include the use of rip rap along approx 525ft of shoreline with approx 325 tons of rip rap. Shoreline stabilization (rip rap) shall be installed by boat.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →