Construction of the pump station. The project generally consists of construction of a 7,200 SF building to serve as a potable water pump station with backup generator. The pump station includes but not limited to the suction and discharge headers, eight pump cans, four pumps, four motors, and associated electrical power distribution, lighting, and instrumentation & controls; and site work including a paved service road, site security fencing, and all associated work ("Work") as indication in the Contract Documents.
Notice Inviting Bids - Backcountry Pump Station
City of Auburn
Seeks bids for the miscellaneous pump station improvements project.
City of Johnson City
Construction of a new gravity interceptor, pump station, and force main in Washington County, Tennessee. The project generally includes a new 18" gravity interceptor, package wastewater pump station, solids grinder, 12" force main, surge valve, Yard piping and valving, electrical, standby generator, site work, and paving. An existing pump station will also be demolished after the new station is operational.
City of Beeville
Project will include installation of One (1) 300kW Generator and One (1) 400A Automatic Transfer Switch at the FM 351 Booster Pump Station. The Cleveland Booser Pump station will include installation of One (1) 200kW Generator and One (1) 300A Automatic Transfer Switch