US 1 (Washington Boulevard) from MD 979 (Main Street) to Gorman Road Pedestrian Safety Action Plan RFP
Project consists of reconstruction of approx. 2.1 miles of existing pavement shoulder/outside lanes to 10-foot-wide street level shared use paths; construction of new 2-foot-wide concrete median separating street level shared use paths from vehicular traffic lanes for an approximate total length of 0.35 miles; reconstruction of existing and new construction of 5-foot-wide concrete sidewalk approx. 0.8 miles in length to be americans with disabilities act (ada) compliant; construction and reconstruction of ada curb ramps to be ada compliant; install crosswalks at street intersections and select driveway locations.