Summary
This contract consists of the rental of a 100-ton (480V-3PH) air cooled chiller temporary unit, while a BCE project is authorized and executed to purchase and replace the damaged Unit. Initial
award is for a 12-month rental and shall include three (3), one (1) month options to be exercised in FY27 if necessary. Contractor is responsible for bringing to the base all required equipment including connections and cables. Contractor must also provide installation/final connections and start-up. Contractor will need 30 feet of water pipe connections and 40 feet of electrical connections from temp chiller to building. See attached file.