Summary
Work include 2,950 LF 10" force main; 2 EA combination air/vacuum release structure; 1,500 LF 24" gravity sewer; 4,850 LF 18" gravity sewer; 150 LF 12" gravity sewer; 50 LF 10" gravity sewer; 150 LF 8" gravity sewer; 1,950 LF 6" sewer service connection; 3,150 LF asbestos cement pipe removal and disposal; 2,400 LF pre-lining stormwater cctv inspection; 600 LF stormwater pipe heavy cleaning; 1,200 LF 12" stormwater pipe lining; 700 LF 15" stormwater pipe lining; 500 LF 18" stormwater pipe lining; 150 LF 12" stormwater pipe; 200 LF 15" stormwater pipe; 100 LF 18" stormwater pipe. See attached file for more.