Summary
Work covered by these Contract Documents consists of demolishing drywall and the associated drywall framing on the east and west M-K tunnel bridge walls, cleaning and painting of the existing interior bridge structural steel framing and insulated metal wall panels, painting of the existing drywall ceiling and painting of the existing north wall of the M-K tunnel bridge, and other items described in the Bidding Documents for the Wastewater Treatment Plant L Building HVAC and Miscellaneous Upgrades Project complete and operational for the City of Appleton, Calumet, Outagamie and Winnebago Counties, Wisconsin.