Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project is to construct a new distribution substation and approx. 3.9 miles of new 69-kilovolt electric transmission line.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Extend an existing 60 KV overhead transmission line to provide service to a new substation. The substation will be designed and constructed by Others. Extension will consist of two new structures to cut into the existing transmission line and drop into the new substation. The new transmission conductor to be installed for the substation spans is bundled 715 kcmil ACCR "Stilt". The conductor of the existing transmission line is bundled 954 kcmil AAC "Magnolia". Work includes the installation of 2 custom tubular steel monopoles supported on drilled concrete piers.
Posted Date
Nov 24, 2025
Due Date
Jan 8, 2026
Release: Nov 24, 2025
Close: Jan 8, 2026
Extend an existing 60 KV overhead transmission line to provide service to a new substation. The substation will be designed and constructed by Others. Extension will consist of two new structures to cut into the existing transmission line and drop into the new substation. The new transmission conductor to be installed for the substation spans is bundled 715 kcmil ACCR "Stilt". The conductor of the existing transmission line is bundled 954 kcmil AAC "Magnolia". Work includes the installation of 2 custom tubular steel monopoles supported on drilled concrete piers.
Premium
Access the largest public sector contact database
Transmitter Site/Transmission Line Replacement.
Posted Date
-
Due Date
Dec 11, 2025
Close: Dec 11, 2025
Transmitter Site/Transmission Line Replacement.
The City of Trotwood is soliciting services for the MOT-Autumn Leaf Drive project to replace a deficient bridge and improve connectivity near Westbrooke Village Apartments and Olive Road, with an estimated construction cost of $613,720. Required services include preparation of construction contract plans (non-complex roadway design), Level 1 bridge design, geotechnical testing and field exploration, environmental permitting, and right-of-way acquisition services. The anticipated authorization is February 2026, with construction expected to start April 1, 2029 and complete October 31, 2029.
Posted Date
Dec 8, 2025
Due Date
Jan 12, 2026
Release: Dec 8, 2025
Close: Jan 12, 2026
The City of Trotwood is soliciting services for the MOT-Autumn Leaf Drive project to replace a deficient bridge and improve connectivity near Westbrooke Village Apartments and Olive Road, with an estimated construction cost of $613,720. Required services include preparation of construction contract plans (non-complex roadway design), Level 1 bridge design, geotechnical testing and field exploration, environmental permitting, and right-of-way acquisition services. The anticipated authorization is February 2026, with construction expected to start April 1, 2029 and complete October 31, 2029.
AvailableProvide fuseless shunt capacitor bank for substation project.
Posted Date
Dec 8, 2025
Due Date
Jan 16, 2026
Release: Dec 8, 2025
Close: Jan 16, 2026
Provide fuseless shunt capacitor bank for substation project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis