Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Texas Health and Human Services Commission
Installation of a new automatic transfer switch. The Contractor shall complete the removal of the existing 600-amp automatic transfer switch (ATS) that is out of services and connect a new 600-amp ATS.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Charleston Water System
The work to be performed consists of the replacement of the existing automatic transfer switch, main breaker switchboard and fire pump controller.
Posted Date
Nov 12, 2025
Due Date
Dec 12, 2025
Release: Nov 12, 2025
Charleston Water System
Close: Dec 12, 2025
The work to be performed consists of the replacement of the existing automatic transfer switch, main breaker switchboard and fire pump controller.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
West Baton Rouge Parish
Provide one (1) new standby natural gas generator system with automatic transfer switch (ATS) to include the generator, connection to electrical controls, connection to the natural gas system, testing, adjusting, and start-up.
Posted Date
Nov 13, 2025
Due Date
Dec 2, 2025
Release: Nov 13, 2025
West Baton Rouge Parish
Close: Dec 2, 2025
Provide one (1) new standby natural gas generator system with automatic transfer switch (ATS) to include the generator, connection to electrical controls, connection to the natural gas system, testing, adjusting, and start-up.
AvailableMissouri Office of Administration
The State of Missouri Office of Administration is seeking bids to upgrade the diesel-engine-driven generator control system and transfer switch and associated supporting equipment and building modifications at Moberly Correctional Center. Project documents are distributed via the OA FMD online planroom (documents available for purchase or refundable hard-copy deposit); a pre-bid meeting is scheduled and bids are due 2025-12-04.
Posted Date
-
Due Date
Dec 4, 2025
Missouri Office of Administration
Close: Dec 4, 2025
The State of Missouri Office of Administration is seeking bids to upgrade the diesel-engine-driven generator control system and transfer switch and associated supporting equipment and building modifications at Moberly Correctional Center. Project documents are distributed via the OA FMD online planroom (documents available for purchase or refundable hard-copy deposit); a pre-bid meeting is scheduled and bids are due 2025-12-04.
AvailableMissouri Office of Administration
The project consists of upgrading the existing diesel-engine-driven generator control system and transfer switch at the Power Plant including the associated supporting equipment and building modifications.
Posted Date
Oct 10, 2025
Due Date
Dec 4, 2025
Release: Oct 10, 2025
Missouri Office of Administration
Close: Dec 4, 2025
The project consists of upgrading the existing diesel-engine-driven generator control system and transfer switch at the Power Plant including the associated supporting equipment and building modifications.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →