Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Aurora Hudson Rd Waterline Replacement Project.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The Town of Bristol, Vermont seeks sealed bids for the Bristol West Waterline Replacement Project, a multi‑street upgrade to replace aging water mains and appurtenances. The project involves approximately 9,600‑9,650 feet of waterline replacement within Bristol, VT, with a pre‑bid/site visit scheduled for January 22, 2026. Bids are due February 12, 2026 at 1:00 PM local time.
Posted Date
-
Due Date
Feb 12, 2026
Close: Feb 12, 2026
The Town of Bristol, Vermont seeks sealed bids for the Bristol West Waterline Replacement Project, a multi‑street upgrade to replace aging water mains and appurtenances. The project involves approximately 9,600‑9,650 feet of waterline replacement within Bristol, VT, with a pre‑bid/site visit scheduled for January 22, 2026. Bids are due February 12, 2026 at 1:00 PM local time.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project consists of installing a 12" PVC waterline. Installation of 12" C900 PVC piping, fittings, fire hydrants, PRV vault, water sampling stations, valves and valve boxes, and other appurtenances.
Posted Date
-
Due Date
Jan 12, 2026
Close: Jan 12, 2026
The project consists of installing a 12" PVC waterline. Installation of 12" C900 PVC piping, fittings, fire hydrants, PRV vault, water sampling stations, valves and valve boxes, and other appurtenances.
AvailableThis RFP is for the installation of a new 8-inch waterline, including abandoning existing waterlines, along Tremont Street and 1st West in Tremonton, UT.
Posted Date
-
Due Date
Jan 20, 2026
Close: Jan 20, 2026
This RFP is for the installation of a new 8-inch waterline, including abandoning existing waterlines, along Tremont Street and 1st West in Tremonton, UT.
AvailableWork includes approx 3,525 LF 3" PVC SDR21 class 200 waterline; 3,525 LF final cleanup of affected water main route; 9 EA reconnect existing near side meter with new 3/4" service line. See outside link.
Posted Date
Dec 17, 2025
Due Date
Jan 22, 2026
Release: Dec 17, 2025
Close: Jan 22, 2026
Work includes approx 3,525 LF 3" PVC SDR21 class 200 waterline; 3,525 LF final cleanup of affected water main route; 9 EA reconnect existing near side meter with new 3/4" service line. See outside link.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →