Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The State of Delaware is soliciting bids for the Auburn Valley State Park Benge Road Sewer project, which involves replacement of the Benge Road pump station and associated sewer and restoration work. Scope includes erecting a project sign, traffic maintenance, constructing duplex and simplex grinder pump stations and metering manhole, force main installation by open cut and directional drilling, gravity sewer, manhole and lateral cleanout installation, paving and roadway restoration, erosion and sediment control, contingent rock excavation and Type C Borrow backfill, plus testing, start-up, manufacturer training and O&M manuals. The procurement requires a mandatory pre-bid meeting and performance/payment bonds; bidders must submit bids by the stated deadline.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The project generally includes installation of approx. 11,400 feet of 8” and 16” PVC waterline and 10,300 feet of 12” PVC sanitary sewer along Summit Road and Morse Road in Licking County, Ohio. The project includes waterline and sanitary sewer piping installation via horizontal directional drilling and jack and bore methods.
Posted Date
Jan 2, 2026
Due Date
Feb 5, 2026
Release: Jan 2, 2026
Close: Feb 5, 2026
The project generally includes installation of approx. 11,400 feet of 8” and 16” PVC waterline and 10,300 feet of 12” PVC sanitary sewer along Summit Road and Morse Road in Licking County, Ohio. The project includes waterline and sanitary sewer piping installation via horizontal directional drilling and jack and bore methods.
AvailableEarly Settlers Road Sidewalk (Robious Road to Huguenot Park) involves the construction of a five-foot wide concrete sidewalk along Early Settlers Road from Robious Road to the entrance to Huguenot Park totaling approx. 1,450 LF. The project also includes curb and gutter, a culvert extension and other drainage facilities, traffic signal modifications, crosswalks, and maintenance of traffic. work will include grading, concrete paving, drainage infrastructure, erosion & sediment control, signage, pavement markings, signal modifications, and other items necessary for the completion of the work.
Posted Date
Jan 8, 2026
Due Date
Feb 12, 2026
Release: Jan 8, 2026
Close: Feb 12, 2026
Early Settlers Road Sidewalk (Robious Road to Huguenot Park) involves the construction of a five-foot wide concrete sidewalk along Early Settlers Road from Robious Road to the entrance to Huguenot Park totaling approx. 1,450 LF. The project also includes curb and gutter, a culvert extension and other drainage facilities, traffic signal modifications, crosswalks, and maintenance of traffic. work will include grading, concrete paving, drainage infrastructure, erosion & sediment control, signage, pavement markings, signal modifications, and other items necessary for the completion of the work.
Procurement for the construction of the Jordan Road Phase 3 Force Main and Sewer Pump Station.
Posted Date
-
Due Date
Feb 6, 2026
Close: Feb 6, 2026
Procurement for the construction of the Jordan Road Phase 3 Force Main and Sewer Pump Station.
AvailableContractor shall perform all the work for the construction of approx. 3,000 LF of 15" VCP trunk sewer, 900 LF of 8" VCP sewer main, manholes, sewer service laterals, 8" PVC water main and appurtenances in accordance with these specifications and the contract drawings including abandonment of existing septic tanks and dispersal systems, implementation of construction traffic control, saw cutting pavement, trenching, shoring, dewatering, backfilling, compaction, and restoration of AC pavement, traffic signal loops, signing and striping.
Posted Date
Dec 9, 2025
Due Date
Jan 27, 2026
Release: Dec 9, 2025
Close: Jan 27, 2026
Contractor shall perform all the work for the construction of approx. 3,000 LF of 15" VCP trunk sewer, 900 LF of 8" VCP sewer main, manholes, sewer service laterals, 8" PVC water main and appurtenances in accordance with these specifications and the contract drawings including abandonment of existing septic tanks and dispersal systems, implementation of construction traffic control, saw cutting pavement, trenching, shoring, dewatering, backfilling, compaction, and restoration of AC pavement, traffic signal loops, signing and striping.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis